My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INVITATION TO BID 24-07-01 CONSTRUCTION OF INTRACOASTAL SPORTS PARK
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-07-01) Construction of Intracoastal Sports Park
>
INVITATION TO BID 24-07-01 CONSTRUCTION OF INTRACOASTAL SPORTS PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 1:06:34 PM
Creation date
7/31/2024 1:01:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Mr. Mark Castano, P.E. February 21, 2024 <br />Keith & Associates, Inc. . Page 7 <br />Geotechnical Study – Intra Coastal Sports Complex – 15800 Collins Avenue NV5 Project No.: 17990 <br /> <br />CONSTRUCTION QUALITY ASSURANCE - INFRASTRUCTURE - ENERGY - PROGRAM MANAGEMENT - ENVIRONMENTAL <br />After preparation as described above, areas for structures that will have pavements on grade <br />should be proof-rolled. Proof-rolling should include planned development footprints plus a <br />five-foot perimeter. The densification should be observed by NV5 to identify and mitigate any <br />weak subgrade conditions evidenced by yielding or rutting at the wheels of the compactor. <br /> <br />2. New structural fill should consist of either inorganic, non-plastic sand having less than 10 <br />percent material passing the No. 200 sieve, or crushed limestone with a maximum rock size <br />of six (6) inches. In particular, fill soils placed within the upper 12 inches of the subgrade of <br />building slabs on grade should consist of either sand with less than 10 percent passing the <br />number 200 sieve, or crushed limestone with a maximum particle size of three (3) inches. <br /> <br />Based on our boring data, Layer 1 that consist of clean sands and limestone fragments <br />should satisfy the fill criteria. The materials might require localized sorting and moisture- <br />conditioning prior to re-use. Topsoil, organics, silt and peat should not be used as structural <br />fill. In any event, representative samples of the fill soils should be collected for classification <br />and compaction testing. The maximum dry density, optimum moisture content, gradation, <br />and plasticity should be determined. These tests are needed for quality control of the <br />compacted fill. <br /> <br />3. Fill soils should be placed with loose lift thicknesses of not more than 12-inches, moisture- <br />conditioned to within two (2) percent of the optimum moisture content based on ASTM D- <br />1557, and compacted to a minimum 95 percent relative compaction1. One test should be <br />performed for each 2,500 square feet of proof rolling and fill area per lift of fill soils. If during <br />the compaction process, the fill shows evidence of yielding under the weight of the <br />compactor, it should be removed and replaced with dry granular fill described above. Fill <br />particles exceeding one (1) inch in size should not be allowed to nest within the fill. <br /> <br />4. The vibrations produced by the operation of the roller/compactor should be monitored for <br />potential adverse effect on adjacent existing structures, pavements, and utilities. If existing <br />foundations and nearby structures will be affected by the vibration of the compactor, the <br />compaction procedure may require modification as approved by NV5. <br /> <br />7.2 FOUNDATION SUPPORT <br /> <br />7.2.1 ACIP <br />1. Our recommended tip elevation, allowable pile axial capacities, and grout strength for <br />foundation support are presented in the table below. <br /> <br />TABLE 3 - SUMMARY OF ACIP PILE ALLOWABLE CAPACITIES <br />Pile <br />Diameter <br />(in) <br />Minimum <br />Pile Tip <br />Elevation <br />(ft. NGVD) <br />Allowable <br />Compression <br />(kips) <br />Allowable <br />Tension <br />(kips) <br />Allowable <br />Lateral Load <br />(kips) <br />Minimum <br />Grout <br />Strength <br />(ksi) <br />14 -24 80 40 4 5 <br />Notes: <br />i. Minimum pile tip elevation based on the assumed site grade of +6 feet NGVD at the time of the borings. <br />ii. Required grout strength is for a 28-day test. <br />iii. Allowable lateral load is for lateral movement ½ to 3/8 inch. <br /> <br /> <br />1 Relative compaction refers to the in-place dry unit weight of a material expressed as a percentage of the maximum dry unit weight of the <br />same material as determined in the laboratory using the Modified Proctor procedure (ASTM D1557).
The URL can be used to link to this page
Your browser does not support the video tag.