My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEGO CONSTRUCTION
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-07-01) Construction of Intracoastal Sports Park
>
LEGO CONSTRUCTION CO
>
LEGO CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 11:27:33 AM
Creation date
9/11/2024 11:24:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP ITB # 24-07-01 - INTRACOASTAL SPORTS COURT COMPLEX <br />CITY OF SUNNY ISLES BEACH 16 <br />Dr. Gilbert L. Porter <br />Elementary School <br />Miami Dade County Public Schools <br />Past Experience- Project #3 <br />Renovation of existing 32 restrooms for ADA <br />compliance. Replacement of existing 7 AHUs, <br />72 VAVs, and new EMS controls. Demolition of <br />existing portable building. Replacement of existing <br />cabinets inside classrooms. Miscellaneous <br />acoustical ceiling replacement. VCT patching <br />around restrooms. Exterior painting and Stucco <br />repair. New doors for restrooms. Replacements <br />of exterior corridor ceiling. New roof flashing <br />and caping for exiting parapet walls. New metal <br />railings. Basketball court resurfaces and striping. <br />Miscellaneous replacement of drinking fountains <br />around the school. <br />Delivery Type: CMAR <br />Contract Role: Prime Contractor <br />Project SF: 80,000 SF <br />Project Cost: $3,904,013 <br />Project Commencement: 7/14/2021 <br />Project Completion: 10/18/22 <br />Key Relevancy <br />• Interior remodeling <br />• 7 AHU <br />• 72 VAV <br />• MECH upgrades <br />• Electrical upgrades <br />• Basketball court resurface and <br />stripping <br />Owner’s Projects <br />Representative <br />POC Nmae: Juliette Hinsey-Pinder, PM <br />P: (305) 995-4270 <br />E: jpinder@dadeschools.net <br />Key Personnel ( Assigned to this Project ) <br />Miguel Guerrero <br />Pre Construction <br />Manager <br />Julio Pinzon <br />Project Manager <br />Mariela Lobo <br />Project Executive <br />Sports <br />Court <br />Harold Bedoya <br />Gen. Superintendent
The URL can be used to link to this page
Your browser does not support the video tag.