My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEGO CONSTRUCTION
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-07-01) Construction of Intracoastal Sports Park
>
LEGO CONSTRUCTION CO
>
LEGO CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 11:27:33 AM
Creation date
9/11/2024 11:24:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP ITB # 24-07-01 - INTRACOASTAL SPORTS COURT COMPLEX <br />CITY OF SUNNY ISLES BEACH 17 <br />Georgia Jones-Ayers <br />Middle School Renovation <br />Miami Dade County Public Schools <br />Past Experience- Project #4 <br />Delivery Type: CMAR <br />Project Budget: $3,040,495 <br />Project Commencement: 06/03/2020 <br />Project Completion: 09/15/2021 <br />Project Square footage: 116,856 SF <br />Key Relevancy <br />• Renovation Project <br />• Phased Approach <br />• Air Handling Units <br />• Mechanical System Upgrades <br />Owner’s Projects <br />Representative <br />POC Name: Leonel Vazquez, Project Manager <br />P: (305) 562-5905 <br />E: lvazquez@dadeschools.net <br />A: 1331 NW 46th St, Miami, FL 33142 <br />Key Personnel ( Assigned to this Project ) <br />Miguel Guerrero <br />Pre Construction <br />Manager <br />Yadier Zarabozo <br />Superintendent <br />Luis Garcia <br />Project Executive <br />This project included comprehensive HVAC renovation <br />for entire Building 1. The scope of work included the <br />installation of Rooftop Units and Pre-treatment AC <br />units on the Roof. These equipment provided fresh air <br />and AC for the first and second-floor corridors along <br />with all the classrooms. Entire new ductwork was <br />installed in all these areas. The project also included <br />the upgrade of existing controls to New DDC Controls <br />and the replacement of Electrical switchgear including <br />Generator, three transformers, ceiling light fixtures <br />in first and second-floor corridors, etc. The scope of <br />work also included finishes for all affected areas. This <br />project included the resurfacing of athletic fields and the <br />construction of a new P.E shelter. The project employed <br />a Phased Approach and ran successfully on Schedule <br />and On Budget. <br />Sports <br />Court <br />Julio Pinzon <br />Project Manager
The URL can be used to link to this page
Your browser does not support the video tag.