ITEM #ITEM UNIT UNIT COST
<br />1 Mobilization LS $ 123,866.00
<br />2 Maintenance of Traffic LS $ 7,140.00
<br />3 Construction Surveying/As-builts LS $ 23,460.00
<br />4 Construction Testing LS $ 2,600.00
<br />5 Bonds & Insurance LS $ 122,450.00
<br />6 Permit Fee LS
<br />7 Overhead and Profit LS $ 487,629.00
<br />ITEM #ITEM UNIT UNIT COST
<br />8 Site clearing (sod, landscape, tree removal)LS $ 149,575.00
<br />9 F&I Control Structure EA $ 8,308.00
<br />10 Miscellaneous site work and underground utilities LS $ 35,700.00
<br />11 Building pad grading LS $ 51,000.00
<br />12 F&I Drainage Well EA $ 138,399.00
<br />13 F&I Drainage Structures (Manhole)EA $ 8,308.00
<br />14 F&I Drainage Structure (Yard Drain)EA $ 5,466.00
<br />15 F&I Drainage Well 15-inch HDPE LF $ 61.20
<br />16 F&I Drainage Well 12-inch HDPE LF $ 58.14
<br />17 F&I Exfiltration Trench CY $ 262.66
<br />18 F&I Sidewalk SY $ 70.18
<br />19 F&I Type 'D' Curb LF $ 50.95
<br />20 F&I Asphalt (Parking Lot & Tennis Courts)SY $ 58.98
<br />21 Storm Pollution Prevention Measures LS $ 5,424.00
<br />22 Regular Excavation (Cut)CY $ 110.00
<br />ITEM #ITEM UNIT UNIT COST
<br />23 F&I 2" Water Service HDPE LF $ 83.00
<br />24 F&I 2" Irrigation Line and RPZ LS $ 14,051.00
<br />25 2" BFP EA $ 5,610.00
<br />26 F&I 6" Sewer line PVC LF $ 218.00
<br />27 Cleanout EA $ 434.00
<br />ITEM #ITEM UNIT UNIT COST
<br />28 F&I Pavement Markings & Signage LS $ 7,803.00
<br />ITEM #ITEM UNIT UNIT COST
<br />29 Marble Chip/Shell Aggregate, Standard Grey Concrete, 4" thickness SF $ 7.98
<br />30 Style "B" Concrete Paver, 8"x8", Camel Shell Stone SF $ 16.39
<br />31 Style "C" Concrete Paver, 4"x8", Camel Shell Stone SF $ 16.39
<br />32 Bench: Landscape Forms-Parc Vue, Backless, 72"L x 22"W x 18"H EA $ 2,147.00
<br />33 Litter Receptacle: Uline-model: H-7234BL(Terrace Trash Can), 32gal, 26"L x 28"W x
<br />38"H EA $ 1,314.00
<br />34 Bike Rack: Landscape Forms-Ride, 4"W x 28"L x 26"H EA $ 1,045.00
<br />35 10'HT Court Fencing, Black Vinyl Coated Chain Link, Windscreen LF $ 72.40
<br />36 Court Cabana Shade Structure, 2 post-black powdercoated frame, shade fabric, 96"L x 72"W
<br />EA $ 16,332.00
<br />37 Tubular Barrier Gates for Entry Drive, Hoover Fence Co-"S" Series, Double gate, 24' overall Length
<br />EA $ 4,284.00
<br />38 Retaining Wall Linear Footage LF $ 129.54
<br />39 Heavy Duty Basketball Goal/Backboard: Sports Play, Inc., Bent Post, 4-1/2" Gal Steel Post, 72" x 48"
<br />Acrylic Backboard EA $ 7,140.00
<br />40 Tennis/Multi-Court Surfacing: Sportsmaster Sports Surfacing, standard court system on
<br />Asphalt SF $ 1.51
<br />ITEM #ITEM UNIT UNIT COST
<br />41 Bursera simaruba - Gumbo Limbo EA $ 915.00
<br />ITB 24-07-02 Intracoastal Sports Court Complex - City of Sunny Isles Beach, FL
<br />BID PRICE SHEET - ADDENDUM # 3 PRICE SHEET - BIDDER'S MUST USE THIS PRICE SHEET
<br />GENERAL CONDITIONS
<br />QTY TOTAL
<br />1 $ 123,866.00
<br />1 $ 7,140.00
<br />1 $ 23,460.00
<br />1 $ 2,600.00
<br />1 $ 122,450.00
<br />1 $ 10,000.00
<br />1 $ 487,629.00
<br />General Conditions Subtotal $ 777,145.00
<br />PAVING, GRADING AND DRAINAGE
<br />QTY TOTAL
<br />1 $ 149,575.00
<br />1 $ 8,308.00
<br />1 $ 35,700.00
<br />1 $ 51,000.00
<br />1 $ 138,399.00
<br />2 $ 16,616.00
<br />3 $ 16,398.00
<br />447 $ 27,356.40
<br />56 $ 3,255.84
<br />219 $ 57,522.54
<br />341 $ 23,931.38
<br />345 $ 17,577.75
<br />1740 $ 102,625.20
<br />1 $ 5,424.00
<br />464 $ 51,040.00
<br />Paving, Grading and Drainage Subtotal $ 704,729.11
<br />WATER AND SEWER
<br />QTY TOTAL
<br />122 $ 10,126.00
<br />1 $ 14,051.00
<br />1 $ 5,610.00
<br />106 $ 23,108.00
<br />4 $ 1,736.00
<br />Water and Sewer Subtotal $ 54,631.00
<br />PAVEMENT MARKING
<br />QTY TOTAL
<br />1 $ 7,803.00
<br />Pavement Marking Subtotal $ 7,803.00
<br />HARDSCAPE
<br />QTY TOTAL
<br />4,821 $ 38,471.58
<br />983 $ 16,111.37
<br />240 $ 3,933.60
<br />3 $ 6,441.00
<br />3
<br /> $ 3,942.00
<br />2 $ 2,090.00
<br />534 $ 38,661.60
<br />1
<br /> $ 16,332.00
<br />1
<br /> $ 4,284.00
<br />442 $ 57,256.68
<br />2
<br /> $ 14,280.00
<br />12,084
<br /> $ 18,246.84
<br />Hardscape Subtotal $ 220,050.67
<br />LANDSCAPE
<br />QTY TOTAL
<br />TREES
<br />7 $ 6,405.00
|