Laserfiche WebLink
42 Conocarpus erectus - Green Buttonwood EA $ 730.00 <br />43 Simaruba glauca - Paradise Tree EA $ 839.00 <br />44 Phoenix dactylifera - date palm: matching EA $ 5,772.00 <br />45 Sabal palmetto - Cabbage Palm EA $ 839.00 <br />46 Satakentia liukiuensis - Satake Palm EA $ 2,389.00 <br />47 Veitchia montgomeryana - Montgomery Palm EA $ 1,276.00 <br />48 Brunfelsia grandiflora - Yesterday, Today & Tomorrow EA $ 42.00 <br />49 Chrysobalanus icaco "Horizontalis" - Horozontal Cocoplum EA $ 42.00 <br />50 Chrysobalanus icaco "Red Tip" - Red Tip Cocoplum EA $ 31.00 <br />51 Conocarpus erectus - Green Buttonwood EA $ 31.00 <br />52 Ficus microcarpa "Green Island" - Green Island Ficus EA $ 12.00 <br />53 Pennisetum setaceum "Alba" - White Fountain Grass EA $ 11.00 <br />54 Zamia pumilla - Coontie EA $ 34.00 <br />55 Stenotaphrum secundastum - St. Augustine Grass SF $ 0.70 <br />56 Planting Soil (6" depth)CY $ 39.00 <br />57 Mulch (3" depth)CY $ 83.00 <br />ITEM #ITEM UNIT UNIT COST <br />58 Irrigation spray heads, nozzles, swing joints, & fittings EA $ 38.37 <br />59 Bubblers, swing joints, & fittings EA $ 23.36 <br />60 Rotors, swing joints, & fittings EA $ 28.91 <br />61 Zone valve assembly & valve box EA $ 436.56 <br />62 Controller EA $ 1,812.54 <br />63 Lateral pipe LF $ 7.00 <br />64 Mainline LF $ 13.26 <br />65 Sleeves LF $ 8.26 <br />ITEM #ITEM UNIT UNIT COST <br />66 Tennis Court Sports Lighting LS $ 268,008.00 <br />67 Parking lot & site light poles, underground feeders, & lighting controls LS $ 115,843.00 <br />6 $ 4,380.00 <br />7 $ 5,873.00 <br />PALMS <br />2 $ 11,544.00 <br />2 $ 1,678.00 <br />14 $ 33,446.00 <br />4 $ 5,104.00 <br />SHRUBS <br />39 $ 1,638.00 <br />48 $ 2,016.00 <br />105 $ 3,255.00 <br />26 $ 806.00 <br />962 $ 11,544.00 <br />188 $ 2,068.00 <br />80 $ 2,720.00 <br />8,000 $ 5,600.00 <br />SOIL AND MULCH <br />144 $ 5,616.00 <br />33 $ 2,739.00 <br />Landscape Subtotal $ 106,432.00 <br />IRRIGATION <br />QTY TOTAL <br />54 $ 2,071.98 <br />43 $ 1,004.48 <br />46 $ 1,329.86 <br />7 $ 3,055.92 <br />1 $ 1,812.54 <br />3,207 $ 22,449.00 <br />340 $ 4,508.40 <br />80 $ 660.80 <br />Irrigation Subtotal $ 36,892.98 <br />SITE LIGHTING & ELECTRICAL <br />QTY TOTAL <br />1 $ 268,008.00 <br />1 $ 115,843.00 <br />Site Lighting & Electrical Subtotal $ 383,851.00 <br />SITE WORK GRAND SUB-TOTAL LINES 1-67: <br /> $ 2,291,534.76 <br />NOTES: <br />1. Quantieis were calculated based on construction document plan set dated 7/03/2024.