My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vercetti
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-07-01) Construction of Intracoastal Sports Park
>
VERCETTI ENTERPRISES
>
Vercetti
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 1:01:20 PM
Creation date
9/11/2024 12:51:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
ITB #24-07-01 – Construction of Intracoastal Sports Park <br /> <br /> <br />Design-Build | Construction | General Contracting <br /> <br />RE: ITB #24-07-01 – Construction of Intracoastal Sports Park <br />– Constructability Coordination <br /> <br />At Vercetti Enterprises, we firmly believe that a proactive approach is the key to <br />success. Our team utilizes a range of powerful tools such as CAD, BIM, Blue Beam, <br />Foxit, and Plan-swift to ensure that our projects run like clockwork. By conducting <br />comprehensive studies of the plans, specifications, cut sheets, submittals, and shop <br />drawings, we are able to identify any discrepancies early on. Our team then overlays <br />the CAD files of the construction documents and the shop drawings from the trades <br />to locate conflicts and provide alternative methods to the A/E team. Thanks to this <br />meticulous approach, we are able to avoid costly mistakes and delays and deliver <br />superior-quality projects that consistently exceed our clients' expectations. <br />To guarantee the triumph of your building project, conducting a series of studies is of <br />utmost importance. <br />Study 1 <br />We will execute a boundary survey with spot elevations and overlay the <br />Architectural, Civil and Structural CADs to find any discrepancies. <br />Study 2 <br />The focus will be on overlaying the CAD files from both plans and shop drawings for <br />the fencing, dug outs, bleachers, prefabricated shelter, plumbing, mechanical, and <br />electrical to detect MEP conflicts. We thoroughly scrutinize the site elevations for <br />conflicts with MEPs to prevent any clashes. <br />Study 3 <br />We will review site plan layouts with MEP trades for final routes. <br />Study 4 <br />Our team will overlay layouts, shop drawings with the site plans, plumbing stub-ups, <br />mechanical stub-ups, electrical stub-ups and landscape furnishings. <br />Study 5 <br />Lastly, it is imperative to review all openings and details to the dugout and pre- <br />fabricated structures for connections and footers together with the structural design <br />for conflicts. By adhering to these studies, the Vercetti team can confidently ensure a <br />seamless and successful building project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.