Laserfiche WebLink
ITEM # ITEM QTY UNIT UNIT COST <br />1 Mobilization 1 LS $ 273,796.71 <br />2 Maintenance of Traffic 1 LS $ - <br />3 Construction Surveying/As-builts 1 LS $ 15,000.00 <br />4 Construction Testing 1 LS $ 15,000.00 <br />5 Bonds & Insurance 1 LS $ 118,885.26 <br />6 Permit Fee 1 LS $ 10,000.00 <br />7 Overhead and Profit 1 LS $ 265,912.99 <br />ITEM # ITEM QTY UNIT UNIT COST <br />8 Site clearing (sod, landscape, tree removal)1 LS $ 83,943.71 <br />9 F&I Control Structure 1 EA $ 5,000.00 <br />10 Miscellaneous site work and underground utilities 1 LS $ - <br />11 Building pad grading 1 LS $ 27,345.00 <br />12 F&I Drainage Well 1 EA $ 45,400.00 <br />13 F&I Drainage Structures (Manhole) 2 EA $ 4,711.00 <br />14 F&I Drainage Structure (Yard Drain) 3 EA $ 6,281.33 <br />15 F&I Drainage Well 15-inch HDPE 447 LF $ 84.31 <br />16 F&I Drainage Well 12-inch HDPE 56 LF $ 673.00 <br />17 F&I Exfiltration Trench 219 CY $ 387.21 <br />18 F&I Sidewalk 341 SY $ 99.61 <br />19 F&I Type 'D' Curb 345 LF $ 24.61 <br />20 F&I Asphalt (Parking Lot & Tennis Courts) 1740 SY $ 55.00 <br />21 Storm Pollution Prevention Measures 1 LS $ - <br />22 Regular Excavation (Cut) 464 CY $ 176.80 <br />ITEM # ITEM QTY UNIT UNIT COST <br />23 F&I 2" Water Service HDPE 122 LF $ 378.01 <br />24 F&I 2" Irrigation Line and RPZ 1 LS $ 9,223.50 <br />25 2" BFP 1 EA $ 6,149.00 <br />26 F&I 6" Sewer line PVC 106 LF $ 137.46 <br />27 Cleanout 4 EA $ 404.75 <br />ITEM # ITEM QTY UNIT UNIT COST <br />28 F&I Pavement Markings & Signage 1 LS $ - <br />ITEM # ITEM QTY UNIT UNIT COST <br />29 Marble Chip/Shell Aggregate, Standard Grey Concrete, 4" thickness 4,821 SF $ - <br />30 Style "B" Concrete Paver, 8"x8", Camel Shell Stone 983 SF $ 30.46 <br />31 Style "C" Concrete Paver, 4"x8", Camel Shell Stone 240 SF $ 41.59 <br />32 Bench: Landscape Forms-Parc Vue, Backless, 72"L x 22"W x 18"H 3 EA $ 5,259.63 <br />33 Litter Receptacle: Uline-model: H-7234BL(Terrace Trash Can), 32gal, 26"L x 28"W x <br />38"H <br />3 EA <br /> $ 1,051.93 <br />34 Bike Rack: Landscape Forms-Ride, 4"W x 28"L x 26"H 2 EA $ 1,577.89 <br />35 10'HT Court Fencing, Black Vinyl Coated Chain Link, Windscreen 534 LF $ 42.86 <br />36 Court Cabana Shade Structure, 2 post-black powdercoated frame, shade fabric, 96"L x 72"W 1 <br />EA <br /> $ 22,150.00 <br />ITB 24-07-02 Intracoastal Sports Court Complex - City of Sunny Isles Beach, FL <br />BID PRICE SHEET - ADDENDUM # 3 PRICE SHEET - BIDDER'S MUST USE THIS PRICE SHEET <br />GENERAL CONDITIONS <br />TOTAL <br /> $ 273,796.71 <br /> $ - <br />PAVING, GRADING AND DRAINAGE <br />TOTAL <br /> $ 83,943.71 <br /> $ 5,000.00 <br /> $ - <br /> $ 27,345.00 <br /> $ 15,000.00 <br /> $ 15,000.00 <br /> $ 118,885.26 <br /> $ 10,000.00 <br /> $ 265,912.99 <br />General Conditions Subtotal $ 698,594.96 <br /> $ 33,968.00 <br /> $ 8,492.00 <br /> $ 95,704.00 <br /> $ - <br /> $ 82,035.00 <br />Paving, Grading and Drainage Subtotal $ 570,327.71 <br /> $ 45,400.00 <br /> $ 9,422.00 <br /> $ 18,844.00 <br /> $ 37,688.00 <br /> $ 37,688.00 <br /> $ 84,798.00 <br /> $ 1,619.00 <br />Water and Sewer Subtotal $ 77,680.00 <br />PAVEMENT MARKING <br />TOTAL <br />WATER AND SEWER <br />TOTAL <br /> $ 46,117.50 <br /> $ 9,223.50 <br /> $ 6,149.00 <br /> $ 14,571.00 <br />TOTAL <br /> $ - <br /> $ 29,942.57 <br /> $ 9,980.86 <br /> $ 15,778.90 <br /> $ 3,155.78 <br /> $ - <br />Pavement Marking Subtotal $ - <br />HARDSCAPE <br /> $ 3,155.78 <br /> $ 22,888.99 <br /> $ 22,150.00 <br />ITB #24-07-01 – Construction of Intracoastal Sports Park