ITEM # ITEM QTY UNIT UNIT COST
<br />1 Mobilization 1 LS $ 273,796.71
<br />2 Maintenance of Traffic 1 LS $ -
<br />3 Construction Surveying/As-builts 1 LS $ 15,000.00
<br />4 Construction Testing 1 LS $ 15,000.00
<br />5 Bonds & Insurance 1 LS $ 118,885.26
<br />6 Permit Fee 1 LS $ 10,000.00
<br />7 Overhead and Profit 1 LS $ 265,912.99
<br />ITEM # ITEM QTY UNIT UNIT COST
<br />8 Site clearing (sod, landscape, tree removal)1 LS $ 83,943.71
<br />9 F&I Control Structure 1 EA $ 5,000.00
<br />10 Miscellaneous site work and underground utilities 1 LS $ -
<br />11 Building pad grading 1 LS $ 27,345.00
<br />12 F&I Drainage Well 1 EA $ 45,400.00
<br />13 F&I Drainage Structures (Manhole) 2 EA $ 4,711.00
<br />14 F&I Drainage Structure (Yard Drain) 3 EA $ 6,281.33
<br />15 F&I Drainage Well 15-inch HDPE 447 LF $ 84.31
<br />16 F&I Drainage Well 12-inch HDPE 56 LF $ 673.00
<br />17 F&I Exfiltration Trench 219 CY $ 387.21
<br />18 F&I Sidewalk 341 SY $ 99.61
<br />19 F&I Type 'D' Curb 345 LF $ 24.61
<br />20 F&I Asphalt (Parking Lot & Tennis Courts) 1740 SY $ 55.00
<br />21 Storm Pollution Prevention Measures 1 LS $ -
<br />22 Regular Excavation (Cut) 464 CY $ 176.80
<br />ITEM # ITEM QTY UNIT UNIT COST
<br />23 F&I 2" Water Service HDPE 122 LF $ 378.01
<br />24 F&I 2" Irrigation Line and RPZ 1 LS $ 9,223.50
<br />25 2" BFP 1 EA $ 6,149.00
<br />26 F&I 6" Sewer line PVC 106 LF $ 137.46
<br />27 Cleanout 4 EA $ 404.75
<br />ITEM # ITEM QTY UNIT UNIT COST
<br />28 F&I Pavement Markings & Signage 1 LS $ -
<br />ITEM # ITEM QTY UNIT UNIT COST
<br />29 Marble Chip/Shell Aggregate, Standard Grey Concrete, 4" thickness 4,821 SF $ -
<br />30 Style "B" Concrete Paver, 8"x8", Camel Shell Stone 983 SF $ 30.46
<br />31 Style "C" Concrete Paver, 4"x8", Camel Shell Stone 240 SF $ 41.59
<br />32 Bench: Landscape Forms-Parc Vue, Backless, 72"L x 22"W x 18"H 3 EA $ 5,259.63
<br />33 Litter Receptacle: Uline-model: H-7234BL(Terrace Trash Can), 32gal, 26"L x 28"W x
<br />38"H
<br />3 EA
<br /> $ 1,051.93
<br />34 Bike Rack: Landscape Forms-Ride, 4"W x 28"L x 26"H 2 EA $ 1,577.89
<br />35 10'HT Court Fencing, Black Vinyl Coated Chain Link, Windscreen 534 LF $ 42.86
<br />36 Court Cabana Shade Structure, 2 post-black powdercoated frame, shade fabric, 96"L x 72"W 1
<br />EA
<br /> $ 22,150.00
<br />ITB 24-07-02 Intracoastal Sports Court Complex - City of Sunny Isles Beach, FL
<br />BID PRICE SHEET - ADDENDUM # 3 PRICE SHEET - BIDDER'S MUST USE THIS PRICE SHEET
<br />GENERAL CONDITIONS
<br />TOTAL
<br /> $ 273,796.71
<br /> $ -
<br />PAVING, GRADING AND DRAINAGE
<br />TOTAL
<br /> $ 83,943.71
<br /> $ 5,000.00
<br /> $ -
<br /> $ 27,345.00
<br /> $ 15,000.00
<br /> $ 15,000.00
<br /> $ 118,885.26
<br /> $ 10,000.00
<br /> $ 265,912.99
<br />General Conditions Subtotal $ 698,594.96
<br /> $ 33,968.00
<br /> $ 8,492.00
<br /> $ 95,704.00
<br /> $ -
<br /> $ 82,035.00
<br />Paving, Grading and Drainage Subtotal $ 570,327.71
<br /> $ 45,400.00
<br /> $ 9,422.00
<br /> $ 18,844.00
<br /> $ 37,688.00
<br /> $ 37,688.00
<br /> $ 84,798.00
<br /> $ 1,619.00
<br />Water and Sewer Subtotal $ 77,680.00
<br />PAVEMENT MARKING
<br />TOTAL
<br />WATER AND SEWER
<br />TOTAL
<br /> $ 46,117.50
<br /> $ 9,223.50
<br /> $ 6,149.00
<br /> $ 14,571.00
<br />TOTAL
<br /> $ -
<br /> $ 29,942.57
<br /> $ 9,980.86
<br /> $ 15,778.90
<br /> $ 3,155.78
<br /> $ -
<br />Pavement Marking Subtotal $ -
<br />HARDSCAPE
<br /> $ 3,155.78
<br /> $ 22,888.99
<br /> $ 22,150.00
<br />ITB #24-07-01 – Construction of Intracoastal Sports Park
|