|
37 Tubular Barrier Gates for Entry Drive, Hoover Fence Co-"S" Series, Double gate, 24' overall
<br />Length
<br />1
<br />EA
<br /> $ 22,888.99
<br />38 Retaining Wall Linear Footage 442 LF
<br /> $ 194.33
<br />39 Heavy Duty Basketball Goal/Backboard: Sports Play, Inc., Bent Post, 4-1/2" Gal Steel Post, 72" x
<br />48" Acrylic Backboard
<br />2 EA
<br /> $ 2,654.00
<br />40 Tennis/Multi-Court Surfacing: Sportsmaster Sports Surfacing, standard court system on
<br />Asphalt
<br />12,084 SF
<br /> $ 3.39
<br />ITEM # ITEM QTY UNIT UNIT COST
<br />41 Bursera simaruba - Gumbo Limbo 7 EA $ 1,950.32
<br />42 Conocarpus erectus - Green Buttonwood 6 EA $ 1,422.11
<br />43 Simaruba glauca - Paradise Tree 7 EA $ 1,218.95
<br />44 Phoenix dactylifera - date palm: matching 2 EA $ 6,399.50
<br />45 Sabal palmetto - Cabbage Palm 2 EA $ 853.27
<br />46 Satakentia liukiuensis - Satake Palm 14 EA $ 4,266.33
<br />47 Veitchia montgomeryana - Montgomery Palm 4 EA $ 2,133.17
<br />48 Brunfelsia grandiflora - Yesterday, Today & Tomorrow 39 EA $ 131.27
<br />49 Chrysobalanus icaco "Horizontalis" - Horozontal Cocoplum 48 EA $ 106.66
<br />50 Chrysobalanus icaco "Red Tip" - Red Tip Cocoplum 105 EA $ 65.01
<br />51 Conocarpus erectus - Green Buttonwood 26 EA $ 196.91
<br />52 Ficus microcarpa "Green Island" - Green Island Ficus 962 EA $ 3.55
<br />53 Pennisetum setaceum "Alba" - White Fountain Grass 188 EA $ 18.15
<br />54 Zamia pumilla - Coontie 80 EA $ 42.66
<br />55 Stenotaphrum secundastum - St. Augustine Grass 8,000 SF $ 0.85
<br />56 Planting Soil (6" depth) 144 CY $ 65.18
<br />57 Mulch (3" depth) 33 CY $ 258.57
<br />ITEM # ITEM QTY UNIT UNIT COST
<br />58 Irrigation spray heads, nozzles, swing joints, & fittings 54 EA $ 19.75
<br />59 Bubblers, swing joints, & fittings 43 EA $ 24.81
<br />60 Rotors, swing joints, & fittings 46 EA $ 23.19
<br />61 Zone valve assembly & valve box 7 EA $ 152.39
<br />62 Controller 1 EA $ 2,133.45
<br />63 Lateral pipe 3,207 LF $ 2.00
<br />64 Mainline 340 LF $ 18.82
<br />65 Sleeves 80 LF $ 26.67
<br />ITEM # ITEM QTY UNIT
<br />UNIT COST
<br />66 Tennis Court Sports Lighting 1 LS $ 244,871.39
<br />67 Parking lot & site light poles, underground feeders, & lighting controls 1 LS $ 69,963.25
<br />ITEM # QTY UNIT UNIT COST
<br />1.00 SPECIALTY EQUIPMENT
<br />1.01 Not used
<br /> $ 41,016.00
<br />Hardscape Subtotal $ 262,161.12
<br />LANDSCAPE
<br />TOTAL
<br /> $ 22,888.99
<br /> $ 85,895.25
<br /> $ 5,308.00
<br />SHRUBS
<br />TREES
<br /> $ 13,652.26
<br /> $ 8,532.66
<br /> $ 8,532.66
<br />PALMS
<br /> $ 5,119.60
<br /> $ 5,119.60
<br /> $ 6,826.13
<br /> $ 5,119.60
<br /> $ 3,413.06
<br /> $ 3,413.06
<br /> $ 12,798.99
<br /> $ 1,706.53
<br /> $ 59,728.62
<br /> $ 8,532.66
<br />Landscape Subtotal $ 170,653.20
<br />IRRIGATION
<br />TOTAL
<br /> $ 1,066.73
<br /> $ 3,413.06
<br /> $ 6,826.13
<br />SOIL AND MULCH
<br /> $ 9,385.93
<br /> $ 8,532.66
<br /> $ 2,133.45
<br />Irrigation Subtotal $ 21,334.50
<br />SITE LIGHTING & ELECTRICAL
<br /> $ 1,066.73
<br /> $ 1,066.73
<br /> $ 1,066.73
<br /> $ 2,133.45
<br /> $ 6,400.35
<br /> $ 6,400.35
<br />SITE WORK GRAND SUB-TOTAL LINES 1-67: $ 2,115,586.12
<br />NOTES:
<br />1. Quantieis were calculated based on construction document plan set dated 7/03/2024.
<br />SITE RELATED SCOPE
<br />TOTAL
<br />TOTAL
<br /> $ 244,871.39
<br /> $ 69,963.25
<br />Site Lighting & Electrical Subtotal $ 314,834.64
<br />SUBTOTAL $ -
<br />ITB #24-07-01 – Construction of Intracoastal Sports Park
|