|
2.00 EXISTING CONDITIONS/SITEWORK
<br />2.01 Not used
<br />ITEM # QTY UNIT UNIT COST
<br />3.00 CONCRETE
<br />3.01 Concrete floor slab 1 LS $ 53,255.06
<br />3.02 Concrete beams 1 LS $ 51,537.15
<br />3.03 Concrete wall reinforcement / filled cells 1 LS $ 51,537.15
<br />3.04 Concrete footings 1 LS $ 132,071.53
<br />4.00 MASONRY
<br />4.01 Masonry walls - 8" thick 1 LS $ 25,768.58
<br />5.00 METALS
<br />5.01 Aluminum wall siding 1 LS $ 59,179.77
<br />5.02 Vertical aluminum battens 1 LS $ 98,500.00
<br />5.03 Aluminum suspended ceiling panels 1 LS $ 61,200.00
<br />6.00 WOOD, PLASTICS & COMPOSITES
<br />6.01 Millwork 1 LS $ 7,200.00
<br />6.02 Misc. rough carpentry 1 LS $ 2,500.00
<br />7.00 THERMAL & MOISTURE PROTECTION
<br />7.01 Roofing and LWC - including all accessories 1 LS $ 56,100.00
<br />7.02 Insulation - walls 1 LS $ -
<br />7.03 Firestopping and smoke sealing 1 LS $ 500.00
<br />7.04 Weather Resistant Barrier 1 LS $ 10,000.00
<br />7.05 Joint sealant 1 LS $ 1,000.00
<br />8.00 OPENINGS
<br />8.01 Storefront system 1 LS $ 26,840.40
<br />8.02 New single doors - metal w/ hollow metal frame (36" x 84")1 LS $ 12,934.50
<br />8.03 New double doors - metal w/ hollow metal frame (60" x 84")1 LS $ 12,934.50
<br />8.04 Pass-thru window 1 LS $ 4,736.54
<br />9.00 FINISHES
<br />9.01 Interior plaster/stucco (includes lath)1 LS $ -
<br />9.02 Epoxy painting (restroom flooring)1 LS $ 5,694.00
<br />9.03 Architectural finishes / GWB and tile accessories 1 LS $ -
<br />9.04 New exterior stucco (5/8" min.) 1 LS $ 30,800.00
<br />9.05 Exterior painting (WRB coat) 1 LS $ 4,200.00
<br />9.06 Interior painting 1 LS $ 4,200.00
<br />9.07 5/8" gypsum board wall and ceiling finish 1 LS $ 8,000.00
<br />9.08 1/2" Densglass sheathing 1 LS $ -
<br />9.09 Wall tile - restrooms 1 LS $ 6,935.40
<br />9.10 Suspended acoustical ceiling tile 1 LS $ 3,000.00
<br />9.11 Framing 1 LS $ 8,000.00
<br />9.12 Stone wall finish 1 LS $ 12,795.64
<br />9.13 VCT Flooring 1 LS $ 4,623.60
<br />10.00 SPECIALTIES
<br />10.01 Acess panels 1 LS $ -
<br />10.02 Toilet room accessories (allowance)1 LS $ 4,950.00
<br />10.03 Room ID signs 1 LS $ 3,206.60
<br />10.04 Fire extinguishers 1 LS $ 250.00
<br />SUBTOTAL $ -
<br />INTRACOASTAL COURTSPORTS BUILDING
<br />TOTAL
<br /> $ 53,255.06
<br /> $ 25,768.58
<br />MASONRY SUBTOTAL $ 25,768.58
<br /> $ 59,179.77
<br /> $ 98,500.00
<br /> $ 51,537.15
<br /> $ 51,537.15
<br /> $ 132,071.53
<br />CONCRETE SUBTOTAL $ 288,400.88
<br />WOOD, PLASTICS & COMPOSITES SUBTOTAL $ 9,700.00
<br /> $ 56,100.00
<br /> $ -
<br /> $ 500.00
<br /> $ 61,200.00
<br />METALS SUBTOTAL $ 218,879.77
<br /> $ 7,200.00
<br /> $ 2,500.00
<br />OPENINGS SUBTOTAL $ 57,445.94
<br /> $ 10,000.00
<br /> $ 1,000.00
<br />THERMAL & MOISTURE PROTECTION SUBTOTAL $ 67,600.00
<br /> $ 26,840.40
<br /> $ -
<br /> $ 5,694.00
<br /> $ -
<br /> $ 30,800.00
<br /> $ 4,200.00
<br /> $ 4,200.00
<br /> $ 12,934.50
<br /> $ 12,934.50
<br /> $ 4,736.54
<br /> $ 4,623.60
<br />FINISHES SUBTOTAL $ 88,248.64
<br /> $ -
<br /> $ 4,950.00
<br /> $ 8,000.00
<br /> $ -
<br /> $ 6,935.40
<br /> $ 3,000.00
<br /> $ 8,000.00
<br /> $ 12,795.64
<br /> $ 3,206.60
<br /> $ 250.00
<br />ITB #24-07-01 – Construction of Intracoastal Sports Park
|