10.05 Sunshade 1 LS $ 16,906.50
<br />10.06 Building sign (by City)
<br />11.00 EQUIPMENT
<br />11.01 Not Used
<br />12.00 FURNISHINGS
<br />12.01 Exterior Furniture 1 LS $ 9,467.34
<br />13.00 SPECIAL CONSTRUCTION
<br />13.01 Security camera infrastructure only (allowance) - does not include cameras 1 LS $ -
<br />14.00 CONVEYING
<br />14.01 Not Used
<br />15.00 FIRE SUPPRESSION
<br />15.01 Not Used
<br />15.20 PLUMBING
<br />15.21 Water closets 1 LS $ 2,800.00
<br />15.22 Lavatories 1 LS $ 2,800.00
<br />15.23 Exterior electric drinking fountain 1 LS $ 2,800.00
<br />15.24 Hose bibb 1 LS $ 1,400.00
<br />15.25 Roof drain & leaders 1 LS $ 5,600.00
<br />15.26 Floor drains 1 LS $ 4,200.00
<br />15.27 Sanitary, water, storm system 1 LS $ 8,400.00
<br />15.50 HEATING, VENTILATION & AIR CONDITIONING
<br />15.51 Exhaust fans 1 LS $ 10,710.00
<br />15.52 HVAC ductwork/supply diffusers/return grills 1 LS $ 10,710.00
<br />15.53 AHU, controls, VAVs, termination 1 LS $ 14,280.00
<br />16.00 ELECTRICAL
<br />16.01 LED interior lay-in light fixtures (2' X 2')1 LS $ 6,996.33
<br />16.02 LED interior lay-in light fixtures (2' X 2') - Emergency 1 LS $ 6,996.33
<br />16.03 LED pendant/surface mount light fixtures 1 LS $ 6,996.33
<br />16.04 LED pendant/surface mount light fixtures - Emergency 1 LS $ 6,996.33
<br />16.05 LED exterior linear light fixtures 1 LS $ 6,996.33
<br />16.06 LED exterior wall mounted light fixtures 1 LS $ 6,996.33
<br />16.07 Batt. operated wall mounted emergency lighting 1 LS $ 6,996.33
<br />16.08 Switches 1 LS $ 6,996.33
<br />16.09 Exit signs 1 LS $ 6,996.33
<br />16.10 Receptacles/GFI/WP/Data 1 LS $ 13,992.65
<br />111.01 Panels/switchgear 1 LS $ 34,981.63
<br />111.02 F/A system 1 LS $ 20,988.98
<br />111.03 Lightning protection 1 LS $ 17,490.81
<br />111.04 Electrical underground 1 LS $ 234,376.90
<br />EQUIPMENT SUBTOTAL $ -
<br /> $ 9,467.34
<br /> $ 16,906.50
<br />SPECIAL TIES SUBTOTAL $ 25,313.10
<br />CONVEYING SUBTOTAL $ -
<br />FURNISHINGS SUBTOTAL $ 9,467.34
<br /> $ -
<br />SPECIAL CONSTRUCTION SUBTOTAL $ -
<br />HEATING, VENTILATION & AIR CONDITIONING SUBTOTAL $ 35,700.00
<br /> $ 1,400.00
<br /> $ 5,600.00
<br /> $ 4,200.00
<br /> $ 8,400.00
<br />PLUMBING SUBTOTAL $ 28,000.00
<br />FIRE SUPPRESSION SUBTOTAL $ -
<br /> $ 2,800.00
<br /> $ 2,800.00
<br /> $ 2,800.00
<br /> $ 6,996.33
<br /> $ 6,996.33
<br /> $ 6,996.33
<br /> $ 6,996.33
<br /> $ 6,996.33
<br /> $ 10,710.00
<br /> $ 10,710.00
<br /> $ 14,280.00
<br /> $ 20,988.98
<br /> $ 17,490.81
<br /> $ 234,376.90
<br />ELECTRICAL SUBTOTAL: $ 384,797.89
<br />BUILDING COMPLEX GRAND SUB-TOTAL: $ 1,239,322.14
<br /> $ 6,996.33
<br /> $ 6,996.33
<br /> $ 6,996.33
<br /> $ 6,996.33
<br /> $ 13,992.65
<br /> $ 34,981.63
<br />ALTERNATES SUBTOTAL $ -
<br />GRAND TOTAL + ALTERNATES $ 3,354,908.26
<br />PROJECT GRAND (BUILDING AND SITE) TOTAL: $ 3,354,908.26
<br />ALTERNATE OPTIONS NOT INCLUDED ABOVE
<br />ITB #24-07-01 – Construction of Intracoastal Sports Park
|