My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
West Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-07-01) Construction of Intracoastal Sports Park
>
WEST CONSTRUCTION
>
West Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 1:12:42 PM
Creation date
9/11/2024 1:09:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />4. APPROACH / METHODOLOGY <br />West Construction, Inc. <br />820 North 4th Street, Lantana, Florida 33462 <br />Phone: 561-588-2027 / Fax: 561-582-9419 <br />Contractor’s License: CGC1516626 <br />www.westconstructioninc.net <br />West Construction, Inc. will perform the required tasks in house with the exception of <br />the scope of work listed on the subcontractors list. All other works will be performed with our <br />in house tradesmen. The project will be managed with an assigned project manager and a <br />full time superintendent. Weekly meetings will be held to keep the City informed of progress <br />and any issues that need attention. West has an unused capacity of around 60% currently <br />and has ample human, financial, equipment, and supplier resources to provide all the <br />requirements under this RFP. <br /> <br />West will utilize P-6 to control the schedule. In addition, West uses a web based project <br />management software system that allows our customers to log in and check the status of <br />submittals, RFI’s, Change Orders, Invoices, Safety, Punch lists, etc. We believe the <br />implementation of this system has changed our industry and it saves time and money in the <br />project delivery process. <br /> <br />West has won several awards over the years, in the area of historic preservation, as well as <br />several Build Florida Awards. West was also selected as builder of the year by the Palm <br />Beach County Chapter of the AIA a some years ago. <br />By making quality assurance the responsibility of each member of our project staff, West <br />ensures it is an integral part of every step of the process, from initial plan review to project <br />closeout. <br /> <br />West’s program for the City of Sunny Isles Beach project will be a project -specific <br />document containing four phases: verifying accuracy, ensuring quality, correcting <br />non-complying work, preventing deficiencies. The following is an overview of our approach to <br />quality control and how each individual plays a part. <br /> <br />VERIFY ACCURACY <br />Our process will include, trade contractor scope review, shop drawing review, pre-installation <br />meetings, and post-installation acceptance criteria review. These decisions determine wheth- <br />er items meet the defined standard or if additional work is necessary for compliance with <br />these requirements. <br /> <br />The Project Manager is responsible for maintaining all current drawings and specifications. <br />Revised contract drawings, sketches issued through the architect and answers to RFI’s are <br />examples of documents inserted into the field and record sets to insure we are working with <br />the most recent information. The Project Manager is also responsible for providing the super- <br />intendent with the latest revisions of approved shop drawings and seeing to it that <br />unapproved shop drawings are not used in the field. All superseded documents are marked <br />void within the set and left there. <br /> <br />ENSURING QUALITY <br />It is the responsibility of the Project Manager to ensure that, prior to placing any purchase <br />order, the proposed materials and equipment meet or exceed the requirements of the design <br />concept and the contract documents. Any proposed deviation must be approved by the City <br />prior to placing the order. <br /> <br />The Project Manager and Superintendent will review all submittals for compliance with <br />contract documents. If they don’t comply, they are returned to the vendor. The Project <br />Manager will ensure the submittal is checked for completeness to facilitate the reviewer’s <br />task.
The URL can be used to link to this page
Your browser does not support the video tag.