|
ITB 24-07-02 Intracoastal Sports Court Complex - City of Sunny Isles Beach, FL
<br />ITEM # ITEM QTY UNIT UNIT COST TOTAL
<br />1 Mobilization 1LS
<br />2 Maintenance of Traffic 1LS
<br />3 Construction Surveying/As-builts 1LS
<br />4 Construction Testing 1LS
<br />5 Bonds & Insurance 1LS
<br />6Permit Fee 1 LS 10,000.00
<br />7 Overhead and Profit 1LS
<br />$
<br />ITEM # ITEM QTY UNIT UNIT COST TOTAL
<br />8 Site clearing (sod, landscape, tree removal)1LS
<br />9 F&I Control Structure 1 EA
<br />10 Miscellaneous site work and underground utilities 1 LS
<br />11 Building pad grading 1LS
<br />12 F&I Drainage Well 1EA
<br />13 F&I Drainage Structures (Manhole) 2 EA
<br />14 F&I Drainage Structure (Yard Drain) 3 EA
<br />15 F&I Drainage Well 15-inch HDPE 447 LF
<br />16 F&I Drainage Well 12-inch HDPE 56 LF
<br />17 F&I Exfiltration Trench 219 CY
<br />18 F&I Sidewalk 341 SY
<br />19 F&I Type 'D' Curb 345 LF
<br />20 F&I Asphalt (Parking Lot & Tennis Courts) 1740 SY
<br />21 Storm Pollution Prevention Measures 1 LS
<br />22 Regular Excavation (Cut) 464 CY
<br />$
<br />ITEM # ITEM QTY UNIT UNIT COST TOTAL
<br />23 F&I 2" Water Service HDPE 122 LF
<br />24 F&I 2" Irrigation Line and RPZ 1 LS
<br />25 2" BFP 1EA
<br />26 F&I 6" Sewer line PVC 106 LF
<br />27 Cleanout 4EA
<br />$
<br />ITEM # ITEM QTY UNIT UNIT COST TOTAL
<br />28 F&I Pavement Markings & Signage 1 LS
<br />$
<br />ITEM # ITEM QTY UNIT UNIT COST TOTAL
<br />29 Marble Chip/Shell Aggregate, Standard Grey Concrete, 4" thickness 4,821 SF
<br />30 Style "B" Concrete Paver, 8"x8", Camel Shell Stone 983 SF
<br />31 Style "C" Concrete Paver, 4"x8", Camel Shell Stone 240 SF
<br />32 Bench: Landscape Forms-Parc Vue, Backless, 72"L x 22"W x 18"H 3 EA
<br />33 Litter Receptacle: Uline-model: H-7234BL(Terrace Trash Can), 32gal, 26"L x 28"W x
<br />38"H 3 EA
<br />34 Bike Rack: Landscape Forms-Ride, 4"W x 28"L x 26"H 2 EA
<br />35 10'HT Court Fencing, Black Vinyl Coated Chain Link, Windscreen 534 LF
<br />36 Court Cabana Shade Structure, 2 post-black powdercoated frame, shade fabric, 96"L x
<br />72"W 1 EA
<br />37 Tubular Barrier Gates for Entry Drive, Hoover Fence Co-"S" Series, Double gate, 24'
<br />overall Length 1 EA
<br />General Conditions Subtotal
<br />PAVING, GRADING AND DRAINAGE
<br />PAVEMENT MARKING
<br />HARDSCAPE
<br />BID PRICE SHEET - ADDENDUM # 3 PRICE SHEET - BIDDER'S MUST USE THIS PRICE SHEET
<br />GENERAL CONDITIONS
<br />WATER AND SEWER
<br />Pavement Marking Subtotal
<br />Water and Sewer Subtotal
<br />Paving, Grading and Drainage Subtotal
<br /> $183,280.00
<br /> $7,500.00
<br /> $30,000.00
<br /> $18,164.00
<br /> $150,168.00
<br />$10,000.00
<br /> $473,926.00 $473,926.00
<br /> 873,038.00
<br /> $54,375.00
<br /> $30,000.00
<br /> $43,750.00
<br /> $12,500.00
<br /> $37,900.00
<br /> $7,500.00
<br /> $6,000.00
<br /> $65.00
<br /> $45.00
<br /> $325.00
<br /> $120.00
<br /> $18.50
<br /> $49.50
<br /> $28,000.00
<br /> $12.50
<br /> 481,507.50
<br /> $40.00
<br /> $2,995.00
<br /> $5,000.00
<br /> $55.00
<br /> $1,250.00
<br /> $7,500.00
<br /> $20.00
<br /> $20.00
<br /> $20.00
<br /> $2,336.00
<br /> $2,666.00
<br /> $1,326.00
<br /> $146.75
<br /> $8,960.00
<br /> $5,600.00
<br /> $183,280.00
<br /> $7,500.00
<br /> $30,000.00
<br /> $18,164.00
<br /> $150,168.00
<br /> $54,375.00
<br /> $30,000.00
<br /> $43,750.00
<br /> $12,500.00
<br /> $37,900.00
<br /> $15,000.00
<br /> $18,000.00
<br /> $29,055.00
<br /> $2,520.00
<br /> $71,175.00
<br /> $40,920.00
<br /> $6,382.50
<br /> $86,130.00
<br /> $28,000.00
<br /> $5,800.00
<br /> $4,880.00
<br /> $2,995.00
<br /> $5,000.00
<br /> $5,830.00
<br /> $5,000.00
<br /> 23,705.00
<br /> $7,500.00
<br /> 7,500.00
<br /> $96,420.00
<br /> $19,660.00
<br /> $4,800.00
<br /> $7,008.00
<br /> $7,998.00
<br /> $2,652.00
<br /> $78,364.50
<br /> $8,960.00
<br /> $5,600.00
|