|
38 Retaining Wall Linear Footage 442 LF
<br />39 Heavy Duty Basketball Goal/Backboard: Sports Play, Inc., Bent Post, 4-1/2" Gal Steel
<br />Post, 72" x 48" Acrylic Backboard 2 EA
<br />40 Tennis/Multi-Court Surfacing: Sportsmaster Sports Surfacing, standard court system on
<br />Asphalt 12,084 SF
<br />$
<br />ITEM # ITEM QTY UNIT UNIT COST TOTAL
<br />TREES
<br />41 Bursera simaruba - Gumbo Limbo 7 EA
<br />42 Conocarpus erectus - Green Buttonwood 6 EA
<br />43 Simaruba glauca - Paradise Tree 7 EA
<br />PALMS
<br />44 Phoenix dactylifera - date palm: matching
<br />2 EA
<br />45 Sabal palmetto - Cabbage Palm
<br />2 EA
<br />46 Satakentia liukiuensis - Satake Palm
<br />14 EA
<br />47 Veitchia montgomeryana - Montgomery Palm
<br />4 EA
<br />SHRUBS
<br />48 Brunfelsia grandiflora - Yesterday, Today & Tomorrow 39 EA
<br />49 Chrysobalanus icaco "Horizontalis" - Horozontal Cocoplum 48 EA
<br />50 Chrysobalanus icaco "Red Tip" - Red Tip Cocoplum 105 EA
<br />51 Conocarpus erectus - Green Buttonwood 26 EA
<br />52 Ficus microcarpa "Green Island" - Green Island Ficus 962 EA
<br />53 Pennisetum setaceum "Alba" - White Fountain Grass 188 EA
<br />54 Zamia pumilla - Coontie 80 EA
<br />55 Stenotaphrum secundastum - St. Augustine Grass 8,000 SF
<br />SOIL AND MULCH
<br />56 Planting Soil (6" depth)144 CY
<br />57 Mulch (3" depth)33 CY
<br />$
<br />ITEM # ITEM QTY UNIT UNIT COST TOTAL
<br />58 Irrigation spray heads, nozzles, swing joints, & fittings 54 EA
<br />59 Bubblers, swing joints, & fittings 43 EA
<br />60 Rotors, swing joints, & fittings 46 EA
<br />61 Zone valve assembly & valve box 7 EA
<br />62 Controller 1 EA
<br />63 Lateral pipe 3,207 LF
<br />64 Mainline 340 LF
<br />65 Sleeves 80 LF
<br />$
<br />ITEM # ITEM QTY UNIT UNIT COST TOTAL
<br />66 Tennis Court Sports Lighting 1 LS
<br />67 Parking lot & site light poles, underground feeders, & lighting controls 1 LS
<br />$
<br />$
<br />NOTES:
<br />1. Quantieis were calculated based on construction document plan set dated 7/03/2024.
<br />ITEM #QTY UNIT UNIT COST TOTAL
<br />1.00 SPECIALTY EQUIPMENT
<br />1.01 Not used
<br /> $
<br />Hardscape Subtotal
<br />LANDSCAPE
<br />SITE RELATED SCOPE
<br />Irrigation Subtotal
<br />SITE LIGHTING & ELECTRICAL
<br />Site Lighting & Electrical Subtotal
<br />IRRIGATION
<br />Landscape Subtotal
<br />SITE WORK GRAND SUB-TOTAL LINES 1-67:
<br />SUBTOTAL
<br /> $219.18
<br /> $8,310.00
<br /> $12.67
<br /> 498,064.34
<br /> $720.00
<br /> $400.00
<br /> $640.00
<br /> $320.00
<br /> $560.00
<br /> $600.00
<br /> $720.00
<br /> $1,872.00 $48.00
<br /> $48.00
<br /> $40.00
<br /> $24.00
<br /> $11.00
<br /> $24.00
<br /> $28.80
<br /> $0.90
<br /> $36.00
<br /> $104.00
<br /> 67,174.00
<br /> $40.00
<br /> $25.00
<br /> $45.00
<br /> $350.00
<br /> $4,000.00
<br /> $2.00
<br /> $2.26
<br /> $4.62
<br /> 19,307.00
<br /> $42,215.00 $42,215.00
<br /> $65,374.00 $65,374.00
<br /> 107,589.00
<br /> 2,077,884.84
<br /> $96,877.56
<br /> $16,620.00
<br /> $153,104.28
<br /> $5,040.00
<br /> $2,400.00
<br /> $640.00
<br /> $4,480.00
<br /> $1,120.00
<br /> $8,400.00
<br /> $2,880.00
<br /> $2,304.00
<br /> $4,200.00
<br /> $624.00
<br /> $10,582.00
<br /> $4,512.00
<br /> $2,304.00
<br /> $7,200.00
<br /> $5,184.00
<br /> $3,432.00
<br /> $2,160.00
<br /> $1,075.00
<br /> $2,070.00
<br /> $2,450.00
<br /> $4,000.00
<br /> $6,414.00
<br /> $768.40
<br /> $369.60
<br /> 0 0 $0.00 $0.00
<br /> 0.00
|