|
2.00 EXISTING CONDITIONS/SITEWORK
<br />2.01 Not used
<br /> $
<br />ITEM #QTY UNIT UNIT COST TOTAL
<br />3.00 CONCRETE
<br />3.01 Concrete floor slab 1LS
<br />3.02 Concrete beams 1LS
<br />3.03 Concrete wall reinforcement / filled cells 1 LS
<br />3.04 Concrete footings 1LS
<br /> $
<br />4.00 MASONRY
<br />4.01 Masonry walls - 8" thick 1 LS
<br /> $
<br />5.00 METALS
<br />5.01 Aluminum wall siding 1LS
<br />5.02 Vertical aluminum battens 1LS
<br />5.03 Aluminum suspended ceiling panels 1LS
<br /> $
<br />6.00 WOOD, PLASTICS & COMPOSITES
<br />6.01 Millwork 1LS
<br />6.02 Misc. rough carpentry 1LS
<br /> $
<br />7.00 THERMAL & MOISTURE PROTECTION
<br />7.01 Roofing and LWC - including all accessories 1 LS
<br />7.02 Insulation - walls 1LS
<br />7.03 Firestopping and smoke sealing 1 LS
<br />7.04 Weather Resistant Barrier 1 LS
<br />7.05 Joint sealant 1LS
<br /> $
<br />8.00 OPENINGS
<br />8.01 Storefront system 1LS
<br />8.02 New single doors - metal w/ hollow metal frame (36" x 84")1LS
<br />8.03 New double doors - metal w/ hollow metal frame (60" x 84")1LS
<br />8.04 Pass-thru window 1LS
<br /> $
<br />9.00 FINISHES
<br />9.01 Interior plaster/stucco (includes lath)1LS
<br />9.02 Epoxy painting (restroom flooring)1LS
<br />9.03 Architectural finishes / GWB and tile accessories 1LS
<br />9.04 New exterior stucco (5/8" min.)1LS
<br />9.05 Exterior painting (WRB coat) 1 LS
<br />9.06 Interior painting 1LS
<br />9.07 5/8" gypsum board wall and ceiling finish 1 LS
<br />9.08 1/2" Densglass sheathing 1 LS
<br />9.09 Wall tile - restrooms 1LS
<br />9.10 Suspended acoustical ceiling tile 1LS
<br />9.11 Framing 1LS
<br />9.12 Stone wall finish 1LS
<br />9.13 VCT Flooring 1LS
<br /> $
<br />10.00 SPECIALTIES
<br />10.01 Acess panels 1LS
<br />10.02 Toilet room accessories (allowance)1LS
<br />10.03 Room ID signs 1LS
<br />10.04 Fire extinguishers 1LS
<br />WOOD, PLASTICS & COMPOSITES SUBTOTAL
<br />INTRACOASTAL COURTSPORTS BUILDING
<br />CONCRETE SUBTOTAL
<br />METALS SUBTOTAL
<br />MASONRY SUBTOTAL
<br />OPENINGS SUBTOTAL
<br />FINISHES SUBTOTAL
<br />THERMAL & MOISTURE PROTECTION SUBTOTAL
<br />SUBTOTAL
<br /> $64,000.00 $64,000.00
<br /> $60,000.00 $60,000.00
<br /> $40,000.00 $40,000.00
<br /> $98,490.00 $98,490.00
<br /> $40,000.00
<br /> $133,779.00 $133,779.00
<br /> $179,600.00 $179,600.00
<br /> $38,745.00
<br /> $51,582.00 $51,582.00
<br /> $5,000.00
<br /> $55,000.00 $55,000.00
<br /> $2,500.00 $2,500.00
<br /> $5,000.00 $5,000.00
<br /> $7,500.00 $7,500.00
<br /> $3,500.00
<br /> $24,425.00 $24,425.00
<br /> $10,348.00 $10,348.00
<br /> $15,522.00 $15,522.00
<br /> $4,572.00
<br /> $12,000.00 $12,000.00
<br /> $3,075.00 $3,075.00
<br /> $7,500.00 $7,500.00
<br /> $9,600.00 $9,600.00
<br /> $4,153.00 $4,153.00
<br /> $9,013.00 $9,013.00
<br /> $8,520.00 $8,520.00
<br /> $2,600.00 $2,600.00
<br /> $8,848.00 $8,848.00
<br /> $1,170.00 $1,170.00
<br /> $5,860.00 $5,860.00
<br /> $8,010.00 $8,010.00
<br /> $4,844.00
<br /> $5,000.00 $5,000.00
<br /> $11,501.00 $11,501.00
<br /> $4,609.00 $4,609.00
<br /> $270.00 $270.00
<br /> 262,490.00
<br /> $40,000.00
<br /> 40,000.00
<br /> $38,745.00
<br /> 352,124.00
<br /> $5,000.00
<br /> 56,582.00
<br /> $3,500.00
<br /> 73,500.00
<br /> $4,572.00
<br /> 54,867.00
<br /> $4,844.00
<br /> 85,193.00
<br /> 0 0 $0.00 $0.00
<br /> 0.00
|