Laserfiche WebLink
2.00 EXISTING CONDITIONS/SITEWORK <br />2.01 Not used <br /> $ <br />ITEM #QTY UNIT UNIT COST TOTAL <br />3.00 CONCRETE <br />3.01 Concrete floor slab 1LS <br />3.02 Concrete beams 1LS <br />3.03 Concrete wall reinforcement / filled cells 1 LS <br />3.04 Concrete footings 1LS <br /> $ <br />4.00 MASONRY <br />4.01 Masonry walls - 8" thick 1 LS <br /> $ <br />5.00 METALS <br />5.01 Aluminum wall siding 1LS <br />5.02 Vertical aluminum battens 1LS <br />5.03 Aluminum suspended ceiling panels 1LS <br /> $ <br />6.00 WOOD, PLASTICS & COMPOSITES <br />6.01 Millwork 1LS <br />6.02 Misc. rough carpentry 1LS <br /> $ <br />7.00 THERMAL & MOISTURE PROTECTION <br />7.01 Roofing and LWC - including all accessories 1 LS <br />7.02 Insulation - walls 1LS <br />7.03 Firestopping and smoke sealing 1 LS <br />7.04 Weather Resistant Barrier 1 LS <br />7.05 Joint sealant 1LS <br /> $ <br />8.00 OPENINGS <br />8.01 Storefront system 1LS <br />8.02 New single doors - metal w/ hollow metal frame (36" x 84")1LS <br />8.03 New double doors - metal w/ hollow metal frame (60" x 84")1LS <br />8.04 Pass-thru window 1LS <br /> $ <br />9.00 FINISHES <br />9.01 Interior plaster/stucco (includes lath)1LS <br />9.02 Epoxy painting (restroom flooring)1LS <br />9.03 Architectural finishes / GWB and tile accessories 1LS <br />9.04 New exterior stucco (5/8" min.)1LS <br />9.05 Exterior painting (WRB coat) 1 LS <br />9.06 Interior painting 1LS <br />9.07 5/8" gypsum board wall and ceiling finish 1 LS <br />9.08 1/2" Densglass sheathing 1 LS <br />9.09 Wall tile - restrooms 1LS <br />9.10 Suspended acoustical ceiling tile 1LS <br />9.11 Framing 1LS <br />9.12 Stone wall finish 1LS <br />9.13 VCT Flooring 1LS <br /> $ <br />10.00 SPECIALTIES <br />10.01 Acess panels 1LS <br />10.02 Toilet room accessories (allowance)1LS <br />10.03 Room ID signs 1LS <br />10.04 Fire extinguishers 1LS <br />WOOD, PLASTICS & COMPOSITES SUBTOTAL <br />INTRACOASTAL COURTSPORTS BUILDING <br />CONCRETE SUBTOTAL <br />METALS SUBTOTAL <br />MASONRY SUBTOTAL <br />OPENINGS SUBTOTAL <br />FINISHES SUBTOTAL <br />THERMAL & MOISTURE PROTECTION SUBTOTAL <br />SUBTOTAL <br /> $64,000.00 $64,000.00 <br /> $60,000.00 $60,000.00 <br /> $40,000.00 $40,000.00 <br /> $98,490.00 $98,490.00 <br /> $40,000.00 <br /> $133,779.00 $133,779.00 <br /> $179,600.00 $179,600.00 <br /> $38,745.00 <br /> $51,582.00 $51,582.00 <br /> $5,000.00 <br /> $55,000.00 $55,000.00 <br /> $2,500.00 $2,500.00 <br /> $5,000.00 $5,000.00 <br /> $7,500.00 $7,500.00 <br /> $3,500.00 <br /> $24,425.00 $24,425.00 <br /> $10,348.00 $10,348.00 <br /> $15,522.00 $15,522.00 <br /> $4,572.00 <br /> $12,000.00 $12,000.00 <br /> $3,075.00 $3,075.00 <br /> $7,500.00 $7,500.00 <br /> $9,600.00 $9,600.00 <br /> $4,153.00 $4,153.00 <br /> $9,013.00 $9,013.00 <br /> $8,520.00 $8,520.00 <br /> $2,600.00 $2,600.00 <br /> $8,848.00 $8,848.00 <br /> $1,170.00 $1,170.00 <br /> $5,860.00 $5,860.00 <br /> $8,010.00 $8,010.00 <br /> $4,844.00 <br /> $5,000.00 $5,000.00 <br /> $11,501.00 $11,501.00 <br /> $4,609.00 $4,609.00 <br /> $270.00 $270.00 <br /> 262,490.00 <br /> $40,000.00 <br /> 40,000.00 <br /> $38,745.00 <br /> 352,124.00 <br /> $5,000.00 <br /> 56,582.00 <br /> $3,500.00 <br /> 73,500.00 <br /> $4,572.00 <br /> 54,867.00 <br /> $4,844.00 <br /> 85,193.00 <br /> 0 0 $0.00 $0.00 <br /> 0.00