My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3733
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3733
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 9:48:45 AM
Creation date
10/30/2024 3:41:39 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3733
Date (mm/dd/yyyy)
10/22/2024
Description
Agreement w/ Advanced Green Technologies to furnish and install solar panels at Government Center.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To: <br />Rick Labinsky <br />City of Sunny Isles Beach <br />18070 Collins Avenue, 4th Floor Sunny Isles Beach, Florida33160 <br />305-792-1805 <br />Date: <br />September 06, 2024 <br />Job Name: <br />SUNNY ISLES BEACH - CITY HALL - CARPORT - SOLAR <br />Address: <br />18070 Collins Ave Sunny Isles Beach, Florida 33160 <br />Reference: <br />Customer Quotation No. 0043786 <br />ENGINEERING AND SITE EVALUATION <br />1. Provide structural evaluation to determine site limitation for the construction and final system dead load. <br />2. Provide full Photometric Lighting study for all carport areas. Areas outside the direct installation of the carports are not included. <br />3. Provide Geotechnical soil borings and engineered foundation design per local, state, and national design standards as required. <br />4. Provide Ground Penetrating Radar (GPR) scan of construction area. <br />5. Furnish full architectural landscape and irrigation drawings as required. <br />6. Provide Federal Aviation Administration aeronautical study to determine glare and or flight hazards from solar installation. <br />7. Provide structural engineering plans and calculations for all carport structures to meet local, state, and national code standards as required. <br />8. FM Global requirements for additional design requirements including enhanced ASCE 7-16 inputs, additional ballast and mechanical <br />attachments are not considered in this proposal and if needed will be added per final FM Global input. <br />9. Secure and pay for local building permits. <br />10. Secure and pay for all required Utility Impact Studies, Utility Net Metering and Utility Interconnection agreements. Utility upgrades to existing <br />utility owned transformers, substations and any other equipment that may be required from an impact study is excluded from this proposal. <br />SYSTEM SIZING <br />Final Solar System Sizing is based upon client specific sizing guidelines and is projected to offset 12.62% of annual kWh consumption. <br />INTERCONNECTION / NET METERING <br />The Solar system we are proposing will be interconnected behind your existing utility meter and will promote the self -consumption of power produced <br />onsite. To accomplish this, we will be required to install a bi-directional meter and coordinate interconnection contract between the system owner and <br />the utility provider. These costs are included in this proposal. <br />1. We have performed an electrical site inspection, Our preliminary interconnection plan would include: <br />SOLAR CARPORT <br />1. Furnish and install auger cast foundations per final geotechnical design and engineered drawings. Foundations to be finished with elevated <br />concrete pier caps. Pier caps to be painted finish. <br />2. Furnish and install AGT Super Span and Single Cantilever Sawtooth custom steel framed carport. Main column supports to be Single Vertical <br />W -Type Columns (I -Beam). Main beam members to be Straight W -Type. Steel finish package to be hot dipped galvanized. <br />3. Low side clearance to be 8' minimum at all locations. <br />4. Column spacing is based on 27' frame centers. Centers may vary based on underground GPR survey and final design. <br />5. All Z Purlin panel supports to be sized per final designs and hot dipped galvanized finish. <br />6. Furnish and Install water management system consisting of rain decking installed below the canopy and mechanically attached to purlin <br />structure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.