My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3733
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3733
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 9:48:45 AM
Creation date
10/30/2024 3:41:39 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3733
Date (mm/dd/yyyy)
10/22/2024
Description
Agreement w/ Advanced Green Technologies to furnish and install solar panels at Government Center.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOLAR MODULES <br />Furnish and install 460 Canadian Solar 395 W -DC solar modules. A total of 181,700 W -DC solar capacity to be installed. <br />SOLARINVERTERS <br />Furnish and install 2 CPS America 60,000 W -AC inverters per final designs. A total of 120,000 W -AC inverter capacity to be installed. <br />DC ELECTRICAL SYSTEM <br />1. Furnish and install #10 PV Wire Home Run cabling per final DC string design. <br />2. All PV wire to be routed through conduit or cable tray in exposed areas outside of the solar array footprint. <br />AC ELECTRICAL SYSTEM <br />1. AC Electrical interconnection design is assumed to be made inside the building Main switch gear (existing) at assumed voltage of 480V Three <br />Phase. <br />2. All conduit, wire, terminations, and balance of systems electrical components to be provided and installed in accordance with NEC Code and <br />AGT best practices. <br />CIVIL <br />1. Provide a detailed Storm Water Pollution Prevention Plan (SWPPP) and implement all required protections per plans. <br />2. Replace all parking stops damaged from construction activity. <br />3. Furnish and install asphalt patches at all new foundations, trenching and excavation locations. <br />4. Restore striping at affected locations only. <br />GUARANTEE -MODULES <br />25 year limited guarantee on power output modules from Canadian Solar. <br />GUARANTEE -INVERTERS <br />10 year guarantee on inverters from CPS America. <br />CONTRACTOR'S WARRANTY <br />1 year warranty on materials and labor from Advanced Roofing, Inc. dba Advanced Green Technologies. <br />QUOTATION <br />FOR THE SUM OF ONE MILLION SIXTY-ONE THOUSAND NINETY-THREE DOLLARS AND TWO CENTS $1,061,093.02 <br />CLARIFICATION AND EXCLUSIONS <br />1. The costs of any tree mitigation efforts (punitive fees, replanting requirements, or other) are excluded from our base price as these cannot be <br />fully understood without further zoning investigations <br />2. Excludes Sales Tax - Solar Energy is Sales Tax Exempt in the State of Florida <br />3. Excludes Lightning Protection <br />4. Excludes BAA/TAA compliance <br />5. Excludes Davis Bacon/Wage Requirements <br />6. Excludes any type of Fire Protection <br />7. Includes a Payment & Performance Bond <br />8. Excludes FM Global Requirements <br />
The URL can be used to link to this page
Your browser does not support the video tag.