Laserfiche WebLink
PREVENTIVE MAINTENANCE AGREEMENT <br />❑ PREVENTIVE MAINTENANCE PROGRAM <br />Inverter Maintenance/Module Inspections Cost - $1,066.00 <br />Communications and Annual Reporting Cost - $1,200.00 <br />We are pleased to submit the following two-year maintenance proposal (once a year visits) for your consideration on the above referenced location as <br />follows: <br />SCOPE OF WORK <br />Inverter Maintenance/Module Inspections: <br />1. Check Irradiance and Module Temperature. <br />2. Check Operating Voltage (AC and DC Voltage) and Current. <br />3. Check Inverter status, Inspect inverter cabinet for damage and proper securement. <br />4. Check Filters and clean as needed. <br />5. Check inverter fans for dirt/dust build-up, clean and verify fans are operating properly. <br />6. Measure torque of all electrical connections, re -torque as needed. <br />7. Inspect all conduits for proper connections to supports, couplings and fittings. <br />8. Inspect all visible wire connections to ensure all are properly secured. <br />9. Inspect signs and labels and add or replace as needed. <br />10. Inspect all racking and attachment systems for loose or missing parts. Repair or replace as needed. <br />11. Visually inspect all PV Modules for physical damage and document conditions. <br />12. Confirm no water leakage to any component parts. <br />13. Remove and dispose of any debris covering the modules that may cause shading. <br />14. A complete documented report will be provided to the client digitally. <br />EXCLUSIONS <br />Excludes lift, if needed. <br />This is a maintenance proposal only and does not cover labor or parts associated with potential repairs not covered under warranty. Work is based only <br />on Scope of Work listed above, any other issues or problems will be identified and the responsible party notified. <br />AGT will make necessary repairs as required after advising the Client of recommended repairs, providing a proposal, and executing scope of work once <br />proposal is approved. <br />COSTS <br />Annual Maintenance: Year 1 - 3 $2,266.00 <br />Annual Maintenance: Year 4 - 6 TBD <br />Annual Maintenance: Year 7 - 9 TBD <br />Hourly T&M Rate for Non -O&M Work (2 -Man Team) $200.00 <br />**Travel charges are billed portal to portal at the hourly rate** <br />All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or <br />deviation from above specifications involving extra costs will be executed only upon written order and will become an extra charge over and above the <br />estimate. All agreements continent upon strikes, accidents, or delays beyond our control. Owner to carry fire, tornado, and other necessary insurance. <br />Due to long lead time for material deliveries and extreme volatility in material prices, Contractor cannot guarantee the price of materials necessary for <br />the completion of the Work. If, subsequent to the execution of this Agreement, there are any unavoidable casualties, material shortages, manufacturer <br />or supplier mandated upcharges on materials, or any other events beyond Contractor's control that cause an increase in the price of the materials used <br />in the performance of the Work, which include but is not limited to, steel, aluminum, cooper, steel -related products, or inverters or other electrical <br />components, the Contract Sum shall be equitably adjusted to account for those unforeseen costs. <br />Steel Pricing is indexed to the FRED Index for "Hot Rolled Steel bars, plates and structural shapes" as well as for Cold Rolled sheet and strip. If cost <br />increased more than 5% from the date of the quote and the time of ownership approval for release on these indexes, we reserve the right to increase <br />the price according to the % increase cited in these indexes. <br />https://fred.stlouisfed.org/seriesfWPU101 https://fred.stiouisfed.org/series/WPU101707 <br />Copper and Aluminum Electrical Wire and Cable is indexed to the FRED Index for "Copper Wire and Cable" and "Aluminum Wire and Cable". If cost <br />increased more than 5% from the date of the quote and the time of ownership approval for release on these indexes, we reserve the right to increase <br />the price according to the % increase cited in these indexes. <br />