My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3732
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3732
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 9:49:44 AM
Creation date
10/30/2024 4:05:21 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3732
Date (mm/dd/yyyy)
10/22/2024
Description
AWD Bid 24-07-02; Agreement w/ MBR Construction, Inc. to provide construction services for the Intracoastal Sports Park.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
labor, material, equipment and services on projects of similar size and <br />complexity. <br />7.4.2. The Contractor shall administer, manage, supervise and direct the Work using the <br />Contractor's best skill, effort and attention. The Contractor shall be responsible to the City for any <br />and all acts or omissions of the Contractor, its employees and others engaged in the Work on behalf <br />of the Contractor. <br />7.5 Warranty <br />7.5.1. The Contractor warrants to the City that all labor furnished to progress the Work <br />under this Contract will be competent to perform the tasks undertaken, that the product of such labor <br />will yield only first-class results, that materials and equipment furnished will be of good quality and <br />new unless otherwise permitted by this Contract, and that the Work will be of good quality, free from <br />faults and defects and in strict conformance with this Contract for a period of one (1 ) year from the <br />date of Final Completion and acceptance by the City unless a longer warranty period is a requirement <br />of the drawings and/or specification for either individual elements of the project or the entire project. <br />All Work not conforming to these requirements may be considered defective. <br />7.5.2. Any warranty required or received from a Subcontractor, manufacturer, or supplier is <br />herein assigned by the Contractor to the City effective immediately upon issuance the fully executed <br />Certificate of Final Completion. Furthermore, the Contractor agrees to supply to the City the <br />originals of all such warranties where same are in writing, and further agrees to execute, if requested <br />by the City, separate assignments of warranty on a form furnished by the City. <br />7.6. The Contractor shall obtain and pay for all permits, fees and licenses necessary and <br />ordinary for the Work save and except as set forth herein. <br />The Contractor shall comply with all lawful requirements applicable to the Work and shall give and <br />maintain any and all notices required by applicable law pertaining to the Work. <br />7.7 Supervision <br />7.7.1. The Contractor shall employ and maintain at the Project site only competent <br />supervisory personnel. Absent written instruction from the Contractor to the contrary, the <br />superintendent shall be deemed the Contractor's authorized representative at the site and shall be <br />authorized to receive and accept any and all communications from the City or the Engineer / <br />Architect. <br />7.7.2. Key administrative, managerial and supervisory personnel assigned by the Contractor to this <br />Project are as follows: <br />Name <br />Mike Boss <br />Jason Cameron <br />Function <br />Project Manager <br />General Superintendent <br />The Contractor shall furnish to the City complete resumes of each of the individuals named above. <br />So long as the individuals named above remain actively employed or retained by the Contractor, <br />MBR CONSTRUCTION, INC. Page 14 of 41 <br />163 <br />
The URL can be used to link to this page
Your browser does not support the video tag.