they shall perform the functions indicated next to their names unless the City agrees to the contrary <br />in writing or unless the City requests the removal of any such individual from the Project. In the <br />event the City requests the removal of any of the individuals named above, the Contractor shall <br />immediately comply and shall immediately replace such individual with a qualified substitute to <br />whom the City makes no objection. In the event one or more individuals not listed above <br />subsequently assumes one or more of those functions listed above, the Contractor shall be bound by <br />the provisions of this Subparagraph 7.7.2 as though such individuals had been listed above. <br />7.8. The Contractor, within fifteen (15) days of commencing the Work, shall submit to the <br />City and the Engineer /Architect for their information, the Contractor's schedule for completing the <br />Work. The Contractor's schedule shall be presented in the critical path (CPM) format. The <br />Contractor's schedule shall be revised no less frequently than monthly (unless the parties otherwise <br />agree in writing) and shall be revised to reflect conditions encountered from time to time and shall <br />be related to the entire Project. Each such revision shall be furnished City and the Engineer / <br />Architect with each Application for Payment. Failure .by the Contractor to strictly comply with the <br />provisions of this Paragraph 7.8 shall constitute a material breach of this Contract. <br />7.8.1. The Contractor, within (15) days of commencing the Work shall submit to the City <br />and the Engineer / Architect for their information, an anticipated monthly draw schedule for the <br />duration of the Work. If during the course of performing the Work the Contractor anticipates a <br />substantial change in the draw schedule, the Contractor shall notify the City and the Engineer / <br />Architect within three (3) days of anticipating such change. For purposes of this paragraph, a <br />substantial change shall be any increase or decrease equaling or exceeding ten percent (10%) of any <br />anticipated monthly draw. <br />7.9. The Contractor shall continuously maintain at the site, in an orderly fashion and <br />format acceptable to the City, for the benefit of the City and the Engineer / Architect one record copy <br />of this Contract and all Contract Documents marked to record on a current basis changes, selections <br />and modifications made during construction. Additionally, the Contractor shall maintain at the site <br />for the City and Engineer / Architect the approved Shop Drawings, Product Data, Samples and other <br />similar required submittals. Upon final completion of the Work, all of these record documents shall <br />be delivered to the City. <br />7.9.1. No less than weekly, the Contractor shall conduct a Project meeting which shall include the <br />Contractor's administrative, managerial and supervisory personnel and representatives of each <br />subcontractor working on the Project site. The meeting shall address, but shall not be limited to, the <br />current status of the Work, including the current Project schedule and the existence of any defective <br />or deficient work as well as the appropriate action required to correct or replace such work. The City <br />and the Engineer / Architect shall have the right, but not the duty, to attend such weekly meetings. <br />The Contractor shall maintain detailed minutes of each such weekly meetings and shall distribute <br />typewritten copies of such minutes to the City and the Engineer / Architect no later than the close of <br />the next workday following completion of such meeting. The Contractor shall further require its <br />General Superintendent to maintain a daily job diary which shall include for each work day the daily <br />weather conditions, the identity of each subcontractor working on the site, the manpower of each <br />subcontractor working on the site, the identity of all visitors to the Project site, documentary progress <br />photographs, and any and all other information reflecting any delays, hindrances, interferences, or <br />other problems encountered or incurred on the Project site. Each week the Contractor shall furnish <br />to the City and the Engineer / Architect on a weekly basis full and complete copies of said daily job <br />diary. <br />MBR CONSTRUCTION, INC. Page 15 of 41 <br />164 <br />