My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3732
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3732
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 9:49:44 AM
Creation date
10/30/2024 4:05:21 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3732
Date (mm/dd/yyyy)
10/22/2024
Description
AWD Bid 24-07-02; Agreement w/ MBR Construction, Inc. to provide construction services for the Intracoastal Sports Park.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
calendar days from the Project initiation specified in the Notice to Proceed and final completion <br />shall be sixty (60) calendar days after Substantial Completion. The total two -hundred and forty <br />(240) calendar days include weekend days and holidays. <br />For the purpose of this Project, Final Completion shall be defined at that point after which the City <br />Engineer or their representative, have made and approved the Final Inspection and the Punch List <br />has been completed, and all deliverables have been provided to the City. <br />3.1.2. The Contractor shall pay the City the sum of One Thousand Five Hundred Dollars <br />and No Cents ($1,500.00) per day for each and every calendar day of unexcused delay in achieving <br />Substantial Completion beyond the date set forth herein for Final Completion of the Work. Any sums <br />due and payable hereunder by the Contractor shall be payable, not as a penalty, but as liquidated <br />damages representing an estimate of delay damages likely to be sustained by the City, estimated at <br />or before the time of executing this Contract. When the City reasonably believes that Final <br />Completion will be inexcusably delayed, the City shall be entitled, but not required, to withhold <br />from any amounts otherwise due the Contractor an amount then believed by the City to be adequate <br />to recover liquidated damages applicable to such delays. <br />3.2. Notice to Proceed Date <br />3.2.1. Upon approval of the Contract for Construction by the City, the City Manager or <br />designee shall issue a "Notice to Proceed" in which the "Notice to Proceed Date" is established as <br />set forth in paragraph 3.1.1. <br />3.2.2. Once the Notice to Proceed Date has been established, the Contractor shall be <br />responsible for the timely and successful completion of the Work and shall endeavor to provide all <br />applicable agencies having jurisdiction with all the required documentation needed to successfully <br />and timely continue the progress of the Work. This may include, but is not limited to providing all <br />necessary documentation in the form of shop drawings, clarifications, calculations, technical data, <br />protocols, product approvals, etc. <br />3.2.3. Under no circumstances will the City accept claims or be responsible for delays <br />arising from failed, unsuccessful, untimely, or late inspections or rejections of inspected Work due <br />to the fault of the Contractor for not supplying all of the necessary documentation in the forms <br />required or requested by the Building Official. <br />3.3 Substantial Completion <br />3.3.1. "Substantial Completion" shall mean that stage in the progression of the Work when <br />the Work is sufficiently complete in accordance with this Contract that the City can enjoy beneficial <br />use or occupancy of the Work and can utilize the Work for its intended purpose. A condition <br />precedent for the achievement of Substantial Completion is the receipt by the City of any and all <br />Certificates of Occupancy or other authorizations required for occupancy by any governmental or <br />regulatory authority. <br />3.4 Time is of the Essence <br />All limitations of time set forth in the Contract Documents are of the essence of this Contract. <br />MBR CONSTRUCTION, INC. Page 6 of 41 <br />155 <br />
The URL can be used to link to this page
Your browser does not support the video tag.