My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3718
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 9:52:57 AM
Creation date
10/30/2024 4:27:15 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3718
Date (mm/dd/yyyy)
09/19/2024
Description
Agreement w/ MBR Construction, Inc., to repair, remediate, and resurfacer the City's Pedestrian Bridge at North Bay Road.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EpdvTjho!Fowfmpqf!JE;!2193E418.88DB.5943.:22G.914D7G:28845EpdvTjho!Fowfmpqf!JE;!ED64EEGG.2G1:.5:C6.C4CB.73549671:658 <br />Cspxbse!Tifsjgg(t!PggjdfCje!2:142NGX <br />plan to complete the Project on time. SHERIFF may withhold progress payments until the <br />MANAGER, is submitted by <br />CONTRACTOR. <br />2.4.4CONTRACTOR shall submit five (5) copies of the required shop drawings to the PROJECT <br />CONSULTANT. All drawings, designs and documents produced by CONTRACTOR <br />maintain any <br />proprietary rights or intellectual rights to the same. For purposes of this Agreement <br />SHERIFF with all intellectual property rights. CONTRACTOR shall keep ina secure <br />location and keep confidential any plans, diagrams, site plans, designs, blue prints, and <br />related documents and not release them to any requester or third party unless and until <br />CONTRACTOR receives permission from SHERIFF for suchrelease. <br />2.4.5CONTRACTOR shall be responsible for verifying the location of allutilities. <br />2.5 <br />CONSULTANT copies of all correspondence, reports, and other communications related to the <br />CONTRACTOR'S responsibilities under thisAgreement. <br />2.6Changes.There shall be no change in the character or extent of the work to be performed by <br />CONTRACTOR except by Change Order agreement in writing between the CONTRACTOR and <br />When the CONTRACTOR believes any extra compensation is <br />requiredforwork andservicesnotcoveredbythisAgreement,CONTRACTOR shallpromptlynotify <br />the PROJECT MANAGER in writing of the intention to make a claim for such extra compensation. <br />Approval must be granted before commencing the work.After notification is given and received, <br />CONTRACTOR shall proceed according to direction from the PROJECT MANAGER. If such <br />notification is not given by the CONTRACTOR prior to the work being performed, no claim for <br />such extra compensation will be considered. Such notice, when given, shall not be construed as <br />providing validity of the claim. All changes authorized by SHERIFF shall be based upon the <br />submittal of substantiating itemized and detailed statements by the CONTRACTOR. Work shall <br />be changed and the total payment amount and date of Substantial Completion shall be modified <br />only as set out in written and signed ChangeOrders. <br />2.7Resolution ofDisputes: <br />2.7.1To prevent all disputes and litigation, it is agreed by the parties hereto that the PROJECT <br />MANAGER shall decide all questions, claims, difficulties and disputes of whatever nature <br />which may arise relative to the technical interpretation of the Agreement documents and <br />fulfillment of this Agreement as to the character, quality, amount and value of any work done <br />and materials furnished, or proposed to be done or furnished under or, by reason of, the <br />Agreement documents estimates and decisions upon all claims, <br />questions, difficulties and disputes shall be final and binding to the extent providedin Section <br />2.7.2. Any claim, question, difficulty or dispute which cannot be resolved by mutual <br />Agreement of SHERIFF and CONTRACTOR shall be submitted to the PROJECT <br />MANAGERinwritingwithinten(10)calendardays.Unlessadifferentperiodoftimeisset <br />forth herein, PROJECT MANAGER shall notify CONTRACTOR in writing of PROJECT <br />decision within ten (10) calendar days from the date of receipt of the <br />submission of the claim, question, difficulty or dispute, unless PROJECTMANAGER <br />80370312:!22;67!BNq/!87 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.