My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3718
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 9:52:57 AM
Creation date
10/30/2024 4:27:15 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3718
Date (mm/dd/yyyy)
09/19/2024
Description
Agreement w/ MBR Construction, Inc., to repair, remediate, and resurfacer the City's Pedestrian Bridge at North Bay Road.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EpdvTjho!Fowfmpqf!JE;!2193E418.88DB.5943.:22G.914D7G:28845EpdvTjho!Fowfmpqf!JE;!ED64EEGG.2G1:.5:C6.C4CB.73549671:658 <br />Cspxbse!Tifsjgg(t!PggjdfCje!2:142NGX <br />3.1The term of this Agreement shall commence, nunc pro tunc, on January 1, 2020 and expire at <br />midnight on December 31, 2023, unless otherwise renewed or extended as provided for herein. <br />The Agreement may be renewed thereafter for two (2) additional one (1) year periods by <br />SHERIFF upon a written notice to CONTRACTOR from SHERIFF prior to the end of thethen <br />current term, upon the same terms and conditions contained herein. If an option to renew is <br />elected by SHERIFF, then said election shall be memorialized by way of anamendment to this <br />Agreement at the election of theSHERIFF. <br />3.2CONTRACTOR shall be instructed to commence the Project by written instructions in theform <br />of a <br />Proceed shall set forth the project initiation date. <br />3.3Time is of the essence throughout this Agreement.The Project shall be substantially completewithin <br />(per timeframe as specified in the project quotation form or issued work order) CALENDAR <br />DAYS from the Project Initiation Date specified in the Notice to Proceed or the Notice to Proceed <br />Date if an Initiation Date is not indicated, and fully completed with all punch list items fullyrepaired <br />and ready for final payment in accordance with Article 4 within (per timeframe as specified in the <br />project quotation form or issued work order) calendar days from the date certified by PROJECT <br />MANAGER and/or CONSULTANT as the date of Substantial Completion, OR (per timeframe as <br />specified in the project quotationform or issued work order) whichever comes first. <br />3.4Liquidated Damages.Upon failure of CONTRACTOR, or in the case of default, the surety, to provide <br />Substantial Completion to the Project within the specified period of time, set forth in Section 3.3, <br />CONTRACTOR, or in the case of default, the surety shall pay SHERIFF the amount of (per <br />terms in project quotation form or issued work order) for each calendar day after the specified <br />time period until such time as substantial completion is certified. For a period of (per terms in <br />project quotation form or issued work order) calendar days the liquid damage fees shall toll <br />during which time, the CONTRACTOR shall complete all remaining work including punch list <br />work necessary to achieve final completion. Failure of the CONTRACTOR to complete all work <br />within the specified (per terms in project quotation form or issued work order) calendar day <br />period shall result in the continuation of liquidated damages recommencing on the (per terms in <br />st <br />project quotation form or issued work order) (ie.31day) and continuing until final completion. <br />After Substantial Completion, should CONTRACTOR, or in the case of default, the surety, fail to <br />complete the remaining work within the time specified in Section 3.3, for completion and <br />readiness for final payment, CONTRACTOR, or in the case of default, the surety, shall pay <br />SHERIFFtheamount asestablishedaboveforeachcalendardayafterthespecifiedtimeperiod. <br />3.4.1Default days shall be counted in calendardays. <br />3.4.2The amounts specified in 3.4 above are not penalties but are liquidated damages to <br />SHERIFF for its inability to obtain full use of the Project. Liquidated damages are hereby <br />fixed and agreed upon between the parties, recognizing the impossibility of precisely <br />ascertaining the amount of damages that will be sustained by SHERIFF as a consequence <br />of such delay, and both parties desiring to obviate any question of dispute concerning the <br />amount of the damages and the cost and effect of thefailure of CONTRACTOR to <br />complete the Agreement on time. <br />80370312:!22;67!BNq/!91 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.