My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3731
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3731
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 11:48:06 AM
Creation date
11/1/2024 10:07:47 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3731
Date (mm/dd/yyyy)
10/22/2024
Description
Agreement w/ Keith & Associates, Inc., d/b/a Keith, for the redevelopment of playground area at Town Center Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID: B9945E53-54BB-436D-B4C0-4D5567EDE5B6 <br />July 18, 2024 / Page 6 of 14 <br />11723.06 — Town Center Park Playground Renovation <br />City of Sunny Isles Beach <br />Deliverables <br />1. Preliminary Engineering / Design Development Plans. <br />2. Preliminary Water, Sewer and Drainage Calculations as required. <br />Task 402 Construction Documents (CD) — Final Engineering <br />Paving, Grading, and Drainage Plans <br />KEITH will prepare on-site paving, grading, and drainage construction plans, to support the <br />proposed development, which meet the requirements of the jurisdictional regulatory agencies. <br />Calculations will be performed to address the impacts of the proposed development relating to <br />the requirements for permit agency submittal. The stormwater management system will address <br />water quality treatment and water quantity storage to meet the requirements of the jurisdictional <br />agencies. It is anticipated that the proposed drainage system will consist of a series of catch <br />basins, pipes, swales, and/or dry retention areas. Exfiltration trenches may be proposed for water <br />quality treatment. Typical sections and standard paving and drainage details and notes for the <br />construction of the paving, grading, and drainage system are included. Soils percolation tests to <br />satisfy regulatory agency requirements will be performed by others as required. <br />No offsite roadway improvements beyond a direct driveway connection to the immediately <br />adjacent road are anticipated and as such not included in this Agreement. Fees for these services <br />will be submitted to CLIENT as additional services under a contract addendum if required. <br />Pavement Marking & Signing Plans <br />KEITH will prepare an on-site signing and pavement marking plan for the project that meets the <br />requirements of the regulatory agencies. This plan will include standard details and notes. <br />Water Distribution and Sanitary Sewer Plans <br />KEITH will prepare on-site combined water distribution and sanitary sewer system plans to service <br />the proposed development. Water and sanitary sewer calculations will be performed to address <br />the impacts of the proposed development relating to the requirements for permit agency submittal. <br />It is anticipated that all existing utility infrastructure is adequate to provide the required domestic <br />water, fire, and sanitary sewer services to the proposed improvements. An evaluation of the <br />existing infrastructure regarding capacity to service the proposed development will be made. <br />Design services for Public Infrastructure improvements required to serve the proposed <br />development will be addressed with a supplemental additional services agreement. These <br />engineering services do not include the extension/replacement and/or upsizing of any water <br />and/or sanitary sewer mains surrounding the site. Services associated with designing and <br />permitting any off-site infrastructure improvements (including off-site lift stations) required to <br />provide service to the site will be addressed as additional services. <br />Erosion Control Plans <br />KEITH will prepare an on-site Erosion Control Plan for the project that meets the requirements of <br />the regulatory agencies and for the Contractor's use in preparing and processing the required <br />Stormwater Pollution Prevention Plan (SWPPP), in compliance with the "Generic Permit for <br />Stormwater Discharge from Large and Small Construction Activities (CGP)" through FDEP. The <br />Erosion Control Plan(s) will include standard details and notes to meet the requirements of the <br />regulatory agencies. <br />Demolition Plan <br />KEITH will prepare an on-site Demolition Plans incorporating removal of the existing <br />improvements in conflict with the proposed facilities. This plan will include standard details and <br />notes. Should permitting be required for this work, it will need to be provided by a licensed <br />EngineeringInspired Design. 123 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.