Laserfiche WebLink
Docusign Envelope ID: B9945E53-54BB-436D-B4C0-4D5567EDE5B6 <br />July 18, 2024 / Page 7 of 14 <br />11723.06 — Town Center Park Playground Renovation <br />City of Sunny Isles Beach <br />demolition contractor. <br />Note: The use of explosive demolition materials and the assessment for or removal of hazardous <br />materials or toxic waste are not included in these services and will not be incorporated in the <br />Demolition Plan. <br />Deliverables <br />1. Construction Documents (60% and Final Construction Documents) for above <br />referenced Plans. <br />2. Specifications — For above referenced Design Elements (specifications may be <br />included in the plan sheets or a separate document for inclusion in the Contract <br />Document Specification book.) <br />3. Water, Sewer and Drainage Calculations as required. <br />Task 403 Engineering Permitting <br />KEITH will prepare and submit the permit applications for the construction of the following <br />improvements and process them through the following regulatory agencies: <br />Development Review <br />Site Plan/Design Review through the City of Sunny Isles Beach <br />Floodplain Management <br />Water and Sewer System <br />Miami Dade County Water and Sewer Department (WASD) — Water and Sanitary <br />Sewer. <br />Florida Department of Environmental Protection (FDEP) —Water and Sanitary Sewer. <br />City of Sunny Isles Beach Engineering Department — Water and Sanitary Sewer. <br />Paving, Grading, and Drainage System <br />• Miami -Dade County DERM — Water Control Section (WCS). <br />• City of Sunny Isles Beach Engineering Department <br />Pavement Markings and Signage <br />• City of Sunny Isles Beach Engineering Department <br />KEITH will supply erosion control plans and ERP / Surface Water management permits, to the <br />owner and building contractor for contractor's use in preparing the NPDES Storm Water Pollution <br />Prevention Plan (SWPPP) and securing the required NPDES Construction Activity Permit. The <br />contractor (as permittee) is responsible to monitor the construction activity for compliance with <br />the NPDES permit and report to FDEP in accordance with the Permit. <br />If additional permits are required, KEITH will process them and the fees for these additional <br />services will be submitted to CLIENT as additional services under a contract addendum if <br />required. <br />Deliverables <br />1. Permit applications and submittal documents required for above listed regulatory <br />agencies for the listed project improvements. <br />Task 501 Electrical Engineering Construction Documents (Subconsultant) <br />Refer to Exhibit 'A' — SDM Engineering (Sub -Consultant) Electrical Engineering Services Scope <br />and Fees <br />The electrical subconsultant (SDM) will provide electrical engineering services for the site work <br />associated with Town Center Park renovations. The scope includes the following: <br />1. Provide electrical power to a drinking fountain (specified by others) <br />Engineering Inspired Design. 124 <br />1 <br />