My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3756
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3756
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 3:07:42 PM
Creation date
12/11/2024 11:05:46 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3756
Date (mm/dd/yyyy)
11/21/2024
Description
1st Amendment to Agreement w/ BEA Architects, Inc. to provide Prof Architectural Design Svcs for renovation of 18050 Collins Ave formerly Tony Romas.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PHASES / SCHEDULE: <br />1. Phase I (Condition Assessment, Due Diligence, Programming & Planning Package): <br />Prepare property conditions assessments. Procure as-builts showing existing conditions. <br />Study Architectural, Structural, FP, MEP, LV conditions, and supporting infrastructure. <br />Review site and building documentation provided by Owner or Building Department. Site <br />visits to collect project data. Prepare Owner project program and refine for City approval. <br />Identify requirements for building modifications, and occupancies of proposed building <br />use. Identify code requirements, including utility connections. <br />architects <br />2. Phase II (Demolition, Shell, and Foundation, 30% AE Drawings Package): Prepare Phased Permit <br />Package of construction containing the demolition, shell, and foundation scope of work. Submit package <br />to building department for permitting Coordination with All agencies having jurisdiction and respond to <br />building department comments. Development of 30% construction documents for remainder of AE <br />scope of work items, to be excluded from permitting, for Owner and stake -holders approval. <br />3. Phase III (Construction Documents 60% and Bidding GMP): Prepare 60% Construction Documents of <br />Architectural, Structural, FP, MEP, LV conditions to be included into bid package for the purpose of <br />procuring a General Contractor. Project Specifications to be included in the construction documents. <br />Assist owner with preparing bidding requirements and coordinate to establish minim criteria for <br />bidders; bid advertisement to be executed by Owner. Respond to bid RFI's and issue addendums, as <br />needed. Collaboration with Owner and stakeholders, and create final bids tabulation. <br />4. Phase IV (Construction Documents 100%): Upon written Notice to Proceed, prepare 100% percent <br />construction documents., Meet with owner for review and approval. Coordinate with owner to maintain <br />within GMP provided by General Contractor, <br />5. Phase V (Permitting): Submit 100% construction documents as revision to building department. <br />Coordination with all Agencies Having Jurisdiction. Respond to building department comments. Owner <br />to issue approved building department drawings to Contractor. <br />6. Phase VI (Construction Administration & Close-out): <br />■ Attend pre-bid meeting <br />■ Attend pre -construction meeting <br />■ Attend Bi -weekly Construction Site Meetings <br />■ Review and respond to Contractor's RFIs <br />■ Perform Punch List Review <br />■ Provide Architect's certification of Substantial Completion <br />■ Perform Final Completion review; issue Final Completion Certificate <br />■ Prepare record documentation based on Contractor's mark-ups <br />■ Review Pay Requests <br />■ Review Change Orders <br />■ Assumed Period of Construction: 26 weeks <br />7. Phase VII (Onsite /Field Investigations & Observations): Perform site visits and support for field <br />investigations and observation, as needed throughout the development of construction. <br />BEA architects, Inc. 11575 NW 7th Avenue, Miami FL 33168 info@beai.com <br />Tel: 305.461 .2053 www.beai.com AR 0012160 <br />458 <br />
The URL can be used to link to this page
Your browser does not support the video tag.