My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3753
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3753
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 3:02:55 PM
Creation date
12/11/2024 11:22:49 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3753
Date (mm/dd/yyyy)
11/21/2024
Description
Project Agreement w/ Keith & Assoc., for Civil Engineering & Landscape Architectural Svcs for Bella Vista Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 8, 2024 / Page 3 of 11 <br />11723.09 — Bella Vista Park <br />City of Sunny Isles Beach <br />It is assumed that there is existing water and sanitary sewer service readily available to the site <br />and have sufficient capacity to provide service to the new park site. <br />Off-site water improvements (including new water services and/or meters) are not included in the <br />scope of work. North Miami Beach (NMB) Utilities is the water service provider and it is <br />anticipated that the existing water service and meter located near the north east corner of the site <br />will provide the required service. <br />The sanitary sewer improvements will consist of a proposed on-site "private" grinder station and <br />a proposed off-site force main extension connecting into the existing public sanitary sewer <br />manhole located east along the service road to provide service to the site. Miami -Dade Water and <br />Sewer Department (MDWASD) is the sanitary sewer service provider. It is anticipated that the <br />proposed on-site "private" grinder station will be a MOPS station. <br />Erosion Control Plan <br />KEITH will prepare an Erosion Control Plan for the project that meets the requirements of the <br />regulatory agencies and for the Contractor's use in preparing and processing the required <br />Stormwater Pollution Prevention Plan (SWPPP), in compliance with the "Generic Permit for <br />Stormwater Discharge from Large and Small Construction Activities (CGP)" through FDEP. The <br />Erosion Control Plan(s) will include standard details and notes to meet the requirements of the <br />regulatory agencies. <br />On-site Demolition Plan <br />KEITH will prepare a Demolition Plans incorporating removal of the existing improvements in <br />conflict with the proposed improvements. This plan will include standard details and notes. Should <br />permitting be required for this work, it will need to be provided by a licensed demolition contractor. <br />Note: The use of explosive demolition materials and the assessment for or removal of hazardous <br />materials or toxic waste are not included in these services and will not be incorporated in the <br />Demolition Plan. <br />Deliverables <br />1. Construction Documents (60% and Final Construction Documents) for above <br />referenced Plans. <br />2. Specifications — For above referenced Design Elements (specifications may be <br />included in the plan sheets or a separate document for inclusion in the Contract <br />Document Specification book.) <br />3. Water Sewer and Drainage Calculations as required. <br />4. Itemized Opinion of Probable Construction Cost. Items and Quantities to be used by <br />City as Bid Tabulation. <br />5. Meetings and Team Coordination — During the specified duration in the project <br />schedule, the KEITH team will attend up to three (3) required meetings and <br />coordination. It is assumed all meetings will be in South Florida. <br />Task 403 Engineering Permitting <br />KEITH will attend required pre -application meetings with agencies having jurisdiction over the <br />facilities designed by KEITH, and prepare and submit the permit applications for the construction <br />of the following improvements and process them through the following regulatory agencies: <br />Development Review <br />• Site Plan/Design Review through the City of Sunny Isles Beach. <br />• Floodplain Management. <br />,IV Engineering Inspired Design. 387 <br />
The URL can be used to link to this page
Your browser does not support the video tag.