Laserfiche WebLink
November 8, 2024 / Page 4 of 11 <br />11723.09 — Bella Vista Park <br />City of Sunny Isles Beach <br />Water and Sewer System <br />• Miami -Dade Water and Sewer Department (MDWASD) — Sanitary Sewer service <br />provider. <br />• Miami -Dade County DERM — Wastewater. <br />• North Miami Beach Water and Sewer Department (NMB) — Water service provider. <br />• City of Sunny Isles Beach Engineering Department. <br />• Florida Department of Transportation (FDOT) — Utility Connection Permit. <br />Paving, Grading, and Drainage System <br />• Miami -Dade County DERM — Water Control Section (WCS). <br />• City of Sunny Isles Beach Engineering Department. <br />• Florida Department of Transportation (FDOT) — Driveway Connection and Drainage <br />Connection Permits. Not included. <br />• Coordination with the Structural and Environmental Engineering (Sub -Consultant) for <br />Processing the required Seawall Permits through: <br />o US Army Corps of Engineers (ACOE) — ERP <br />o Florida Department of Environmental Protection (FDEP) — ERP <br />o Miami -Dade County DERM Class I — Coastal Resources Section. <br />Pavement Markings and Signage <br />• Not Applicable <br />If additional permits are required, KEITH will process them and the fees for these additional <br />services will be submitted to CLIENT as additional services under a contract addendum if <br />required. <br />Deliverables <br />1. Permit applications and submittal documents required for above listed regulatory <br />agencies for the listed project improvements. <br />Task 702 Landscape Construction Documents (CD) <br />Based on the approved Design Development phase, KEITH will develop the construction <br />documents in coordination with the overall design team and CLIENT. The drawings will be <br />developed in a 60% or preliminary documentation for review and coordination, as well as a final <br />for Permit or 100% Construction Documentation. <br />Deliverables <br />1. Construction Documents (60% and Final Construction Documents) <br />a. Hardscape & Layout Plan — Material type and layout. <br />b. Sitework Details — General details and section/elevations for character and project <br />understanding - All structural engineering by others and not included in this <br />proposal. <br />c. Landscape Plan and Details — Specific elements, specification, quantity, layout, <br />notes and details. <br />d. Irrigation Plans and Details — Point of connection, head layout, piping, equipment <br />schedule and details. <br />e. Site Furniture — Furniture layouts and specific catalog cuts and material selections. <br />2. Specifications — For above referenced Design Elements (specifications will be <br />included in the plan sheets). <br />3. Itemized Opinion of Probable Construction Cost. Items and Quantities to be used by <br />City as Bid Tabulation. <br />4. Meetings and Team Coordination — During the specified duration in the project <br />schedule, KEITH will attend all required meetings and coordination. It is assumed all <br />meetings will be in South Florida <br />Engineering Inspired Design. 388 <br />1 <br />