My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3716
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 2:50:54 PM
Creation date
12/17/2024 2:26:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3716
Date (mm/dd/yyyy)
09/19/2024
Description
Approving agreement w/ Schindler Elevator Corp., replacement of elevators at Pedestrian Overpass Bridge at Gateway Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID:41F63DOF-3BC8-4149-8618-1BBEEF49D6F7 <br />Subject Schindler Elevator Modernization Proposal - LSUN-D5PJUJ <br />Page 20 Of 31 <br />Date 6/4/2024 <br />13. A separate 20 amp circuit will be provided if tank heater is provided with the elevator. <br />14. Hxpress oil coolers / heaters need to be on a dedicated circuit. <br />General Requirements <br />1. Provide sufficient space for storage of materials on site throughout the duration of the <br />modernization. <br />2. Provide clear floor space to be used as a work area. <br />3. If not presently outfitted, each elevator lobby should be equipped with smoke detectors, which <br />can be used to initiate automatic fire recall. Actuation from water flow sensing or the general <br />building alarm may require special approval. <br />4. Paint new or modified hoistway equipment to match building aesthetics, as required. <br />5. Provide building signage and floor designations related to other building systems, as required. <br />6. Provide building corridor lighting sufficient for illumination of elevator landing sills, as required <br />by code. <br />Electrical Requirements <br />1. The permissible voltage drop for elevator feeders shall not exceed 3% between the service <br />delivered to the building and our supply terminal. <br />2. All three legs of the three-phase feeder must be hot with respect to ground and balanced to <br />each other with no more than a 5% variation between individual legs. <br />3. The maximum permissible voltage variation measured in the machine room under all operating <br />conditions shall not exceed plus or minus 10% of the nominal building supply power source <br />voltage. <br />4. A 20 -amp, single phase, 110VAC, dedicated circuit with a duplex receptacle for the oil heater <br />unit. <br />5. FOR EMERGENCY POWER OPERATION OF ELEVATOR(S): (when required) <br />A. Provide an emergency generator that has the same voltage characteristics as <br />the normal power supply. It should also have the capacity to deliver sufficient <br />power to the main line disconnect switches in the elevator machine room for <br />operating the specified number of elevators used during an emergency at full <br />speed and full load. <br />B. Provide an automatic transfer switch, or switches, for transferring power from <br />normal to emergency power and back again. <br />6. EMERGENCY POWER OPERATION SIGNAL - The following separate indicating signals will <br />be required from the automatic transfer switch to the machine room communication unit for <br />each group of elevators. <br />A. One dry contact to close on emergency power and open on normal power. <br />Provide two #12 AWG wires. <br />
The URL can be used to link to this page
Your browser does not support the video tag.