My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3716
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 2:50:54 PM
Creation date
12/17/2024 2:26:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3716
Date (mm/dd/yyyy)
09/19/2024
Description
Approving agreement w/ Schindler Elevator Corp., replacement of elevators at Pedestrian Overpass Bridge at Gateway Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID: 41 F63DOF-3BC8-4149-8618-1 BBEEF49D6F7 <br />Subject Schindler Elevator Modernization Proposal - LSUN-DSPJUJ <br />Page 22 of 31 <br />Date 6/4/2024 <br />From Building Electrical Distribution Panel <br />Note 1 - Available Fault Current before disconnect <br />Label must show Available Fault Current <br />at Primary of Disconnect <br />Note 2 - Local Electricial Contractor must provide proof of building Available Faui <br />Current Calculations, Manufacturer and model of fuse <br />with supporting fuse charts to show compliance <br />of NEC Code upon request. <br />Note 3 - Available Fault Current after mitigation to be Labeled <br />-Apparent RMS Symmetrical Fault Current" at Secondary <br />of Disconnect. Must not exceed Elevator Equipment <br />rating of 5k SCCR. <br />To Elevator Equipment <br />FIGURE 1: AVAILABLE FAULT CURRENT RATING LABELLING DIAGRAM <br />
The URL can be used to link to this page
Your browser does not support the video tag.