Laserfiche WebLink
<br />20 <br /> RFP 24-12-01 CITYWIDE ELEVATOR MAINTENANCE <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />systems for each unit or group of units shall be checked continuously and necessary tests and <br />corrections shall be done to ensure all circuits are correct and time settings are properly adjusted. <br /> <br />b. The Contractor shall keep guide rails properly lubricated, except where roller guides are used <br />and replace guide shoe gibs or rollers, when required to provide smooth and quiet operation. <br />Control cables shall be replaced when required, or as provided for in the maintenance schedule, <br />whichever comes first. The Contractor shall annually clean the elevator hoist way and related <br />equipment, including rails, inductors, hoist way door hangers and tracks, related devices, <br />switches, buffers, car tops, and pit areas. <br /> <br />c. If applicable, the gear case shall be drained and flushed to remove sediment and grit and refilled <br />with new gear oil as per manufacturer's specifications. All lubricants used must be according to <br />the manufacturer’s specifications or better. <br /> <br />d. Contractor shall be responsible for replacing all wire ropes as often as necessary to maintain an <br />appropriate factor of safety, according to manufacturer's specifications, and equalize the tension <br />on hoisting ropes, resocket ropes for drum machines and replace conductor cables and hoist way <br />and machine-elevator wiring. <br /> <br />e. Adjustments shall be made to elevators in accordance with the original manufacturer's <br />specifications to maintain the original contact speed, the original performance time, including <br />acceleration and deceleration, as designed by the original manufacturer. The contractor shall <br />perform adjustments required to maintain the original door opening and closing times, or as <br />otherwise agreed within the limits of applicable codes. <br /> <br />f. Contractor shall check the group dispatching systems and make tests to determine if circuits <br />and time settings are properly adjusted and adjust necessary for the system to perform as <br />designed by the original manufacturer. <br /> <br />g. The elevator machine rooms, secondary areas, elevator hoist ways, and pit areas shall be kept <br />clean at all times. Contractor shall be responsible for keeping the machine rooms, the exterior of <br />the machinery, and any other parts of the equipment subject to rust, properly painted, identified, <br />and presentable at all times. During each examination, all accumulated refuse in the pit areas shall <br />be discarded off-site. Due to the fumes associated with painting, the Contractor must obtain <br />permission and coordinate with the Public Works Coordinator for the appropriate time to <br />schedule the painting. <br /> <br />h. Machine worn gear, thrust bearings, drive sheave, drive sheave shaft bearings, brake pulley <br />and brake coil, contact linings, and component parts. <br /> <br /> i. Motor and motor generator, motor windings, rotating element, commutator, brushes, brush <br /> holders and bearings. <br /> <br /> j. Silicon control rectifiers, reactors, filters, mufflers, heat sinks, amp traps, transducers, and all <br /> control components must be included. <br />