My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum # 1 City of Sunny Isles Response-RFI Sheet
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Addendum # 1 City of Sunny Isles Response-RFI Sheet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:09:22 AM
Creation date
2/20/2025 9:06:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 083453-1 <br /> <br />SECTION 083453 <br />TSS BR DOOR AND FRAME ASSEMBLY - ALL GLASS <br /> <br />PART 1 - GENERAL <br /> <br />1.1 SECTION INCLUDES <br /> <br />A. Bullet resistant all glass door and frame assembly. <br /> <br />1.2 REFERENCES <br /> <br />A. Underwriters Laboratory UL 752-Standard for Bullet Resisting Equipment. <br /> <br />B. ASTM C 1172 - Standard Specification for Laminated Architectural Flat Glass. <br /> <br />1.3 ACTION SUBMITTALS <br />A. Refer to Section [01 33 00 Submittal Procedures]. <br /> <br />B. Product Data: For each type of door [and glass] including manufacturer recommended <br />installation instructions. <br /> <br />C. Shop Drawings: Include plans, elevations, sections, details, attachment to other work. <br /> <br />D. Samples: For each exposed finish. <br /> <br />1.4 INFORMATION SUBMITTALS <br />A. Product Test Reports: Indicating compliance with requirements <br /> <br />B. Warranty: Sample of finish warranty <br /> <br />1.5 CLOSEOUT SUBMITTALS <br /> <br />A. Refer to Section [01 78 00 Closeout Submittals]. <br /> <br />B. Maintenance data. <br /> <br />1.6 DELIVERY, STORAGE AND HANDLING <br />A. Refer to Section [01 60 00 Product Requirements]. <br /> <br />B. Deliver materials to the project site with the manufacturer’s UL Listed Labels intact and <br />legible. Handle the materials with care to prevent damage. Store materials inside and <br />under cover, stack flat and off floor. Project conditions (temperature, humidity, and <br />ventilation) shall be within the maximum limit recommendations provided by manufacturer. <br />Do not install products stored in conditions outside manufacturer’s recommended limits. <br /> <br />1.7 WARRANTY <br /> <br />A. Workmanship Warranty: All materials shall be warranted against defects for a period of [1] <br />year for the date of receipt at the project site. Provide certificates of manufacturer’s
The URL can be used to link to this page
Your browser does not support the video tag.