My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum # 1 City of Sunny Isles Response-RFI Sheet
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Addendum # 1 City of Sunny Isles Response-RFI Sheet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:09:22 AM
Creation date
2/20/2025 9:06:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 085653-2 <br /> <br />ventilation) shall be within the maximum limit recommendations provided by manufacturer. <br />Do not install products stored in conditions outside manufacturer’s recommended limits. <br /> <br /> <br />1.6 QUALITY ASSURANCE <br /> <br />A. Manufacturer shall be a company that specializes in manufacturing products of the <br />specified type with a record of acceptable experience. <br /> <br />B. Installer shall be a company that specializes in product type specified and shall be certified <br />for the installation by the manufacturer. <br /> <br />C. Manufacturer shall provide a mock-up, if required, for evaluation of surface preparation <br />and application workmanship and color/finish to the Architect for approval prior to start of <br />work. <br /> <br />1.7 DELIVERY, STORAGE & HANDLING <br /> <br />A. Handle the materials with care to prevent damage. <br /> <br />B. Store materials inside and under cover, stack flat and off floor. <br /> <br />C. Project conditions (temperature, humidity, and ventilation) shall be within the maximum <br />limit recommendations set by manufacturer. <br /> <br />D. Do not begin installation of products until inadequate conditions have been corrected. <br /> <br />1.8 WARRANTY <br /> <br />(Specifier Note: The 5-year finish warranty applies to the Class I anodic finishes and the 10 year <br />applies to the 70% PVDF coating finish.) <br /> <br />A. Workmanship Warranty: All materials shall be warranted against defects for a period of [1] <br />year for the date of receipt at the project site. Provide certificates of manufacturer’s <br />standard limited warranty with closeout documents. <br /> <br />B. Finish Warranty: Manufacturer’s warranty against deterioration of factory finishes for the <br />period of [5] [10] years from the date of Substantial Completion. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.1 ACCEPTABLE MANUFACTURERS <br /> <br />A. Basis of Design: <br /> <br />1. Subject to compliance with requirements, provide products by the following: <br /> <br />1. Total Security Solutions, Inc., 935 Garden Lane, Fowlerville, MI 48836, <br />866 734-6277. Attn: Sales Department, sales@tssbulletproof.com. Web: <br />www.tssbulletproof.com. <br />
The URL can be used to link to this page
Your browser does not support the video tag.