Laserfiche WebLink
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 085653-1 <br /> <br />SECTION 085653 <br />TSS BR TRANSACTION WINDOW – HOLE AND BACKER TALK THRU <br /> <br />PART 1 - GENERAL <br /> <br />1.1 REFERENCE <br /> <br />A. Underwriters Laboratory UL 752-Standard for Bullet Resisting Equipment. <br /> <br />B. ASTM A 666-Standard Specification for Annealed or Cold-Worked Austenitic Stainless-Steel <br />Sheet, Strip, Plate and Flat Bar. <br /> <br />C. ASTM E119-98- Standard Test Methods for Fire Tests of Building Construction and Materials <br /> <br />1.2 ACTION SUBMITTALS <br /> <br />A. Refer to Section [01 33 00 Submittal Procedures] <br /> <br />B. Product Data: For each type of framing [and glass] including manufacturer recommended <br />installation instructions. <br /> <br />C. Shop Drawings: Include plans, elevations, sections, details, attachment to other work. <br /> <br />D. Samples: For each exposed finish. <br /> <br />1.3 INFORMATION SUBMITTALS <br /> <br />A. Product Test Reports: Indicating compliance with requirements, including current UL <br />listing verification and test results provided by Underwriters Laboratories. <br /> <br />B. Manufacturer’s Instructions for installation and cleaning of assemblies. All required <br />submittals shall be approved prior to installation. <br /> <br />C. Warranty: Sample of finish warranty <br /> <br />1.4 CLOSEOUT SUBMITTALS <br /> <br />A. Refer to Section [01 78 00 Closeout Submittals]. <br /> <br />B. Maintenance data. <br /> <br />1.5 DELIVERY, STORAGE AND HANDLING <br /> <br />A. Refer to Section [01 60 00 Product Requirements]. <br /> <br />B. Protect windows and accessories in accordance with AAMA CW -10 "Care and Handling of <br />Architectural Aluminum from Shop to Site" until Substantial Completion. <br /> <br />C. Deliver materials to the project site with the manufacturer’s UL Listed Labels intact and <br />legible. Handle the materials with care to prevent damage. Store materials inside and <br />under cover, stack flat and off floor. Project conditions (temperature, humid ity, and