My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum # 1 City of Sunny Isles Response-RFI Sheet
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Addendum # 1 City of Sunny Isles Response-RFI Sheet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:09:22 AM
Creation date
2/20/2025 9:06:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 083453-4 <br /> <br /> <br /> <br /> <br />3.2 INSTALLATION <br /> <br />A. TSS FV Bullet Resistant All Glass Door and Frame Assembly can be installed using, screws <br />and bolts. Method of application shall maintain bullet resistive rating at junctures with <br />concrete floor, door and window frames and other penetrations. <br /> <br />B. Maintain installation tolerance to not exceed 1/16th for squareness, alignment, twist and <br />plumb. Install hardware as specified per manufacturer’s instructions. <br /> <br />C. Do not begin installation until openings have been verified and surfaces properly prepared <br />in accordance with Drawings. <br /> <br />D. All products shall be installed per installation instructions provided by manufacturer. <br /> <br />E. Door and frame assembly shall arrive on site completely pre-fabricated to field dimensions <br />approved by Shop Drawings. <br /> <br />F. Install framing and secure to structure in accordance with manufacturer's <br />recommendations and approved shop drawings. <br /> <br />3.3 PROTECTION <br /> <br />A. Clean and protect door and frame assembly from damage during ongoing construction <br />operations. If damage occurs, remove and replace as required to provide assembly in their <br />original, undamaged condition. <br /> <br />B. Inspection and Cleaning: Verify installation is complete and complies with manufacturer’s <br />requirements. <br /> <br />C. Provide final cleaning of product and accessories, removing excess dust, labels and <br />protective covers. <br /> <br />D. Touch-up, repair or replace damaged products prior to Substantial Completion. <br /> <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.