Laserfiche WebLink
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 085653-4 <br /> <br />B. Factory-applied finish: <br /> <br />1. [Clear Anodic Finish]: Architectural Class I, clear coating AA-M10C22A41 <br />Mechanical Finish Chemical Finish: etched, medium matte; 0.70 mils minimum <br />complying with AAMA 611 "Voluntary Specification for Anodized Architectural <br />Aluminum" <br /> <br />2. [Color Anodic Finish]: Architectural Class I, color coating AA-M10C22A42/A44 <br />Mechanical Finish Chemical Finish: etched, medium matte; 0.70 mils minimum <br />complying with AAMA 611 "Voluntary Specification for Anodized Architectural <br />Aluminum". <br /> <br />a. Color: Dark Bronze. <br /> <br />C. Glazing Panels shall be in sizes as indicated on Drawings. <br /> <br />D. Bullet-Resisting Glazing Material: <br /> <br /> <br />1. Bullet Resistant Level 3 <br />1 1/4" LP 1250 Laminated <br />1 1/4" All Poly 1250 <br />1 1/4” TSS-003 L/S Glass Clad <br /> <br /> <br />E. Cash tray: Provide Brushed Stainless Steel [Counter Mounted] [Recessed]. <br /> <br />1. Cash tray shall be constructed of 18-gauge stainless steel, # 4 finish. <br /> <br />2. Size: 16" x 8" from the outside edge of flanges with a clear opening . <br /> <br />F. Provide a shelf 1 1/2" thick with recessed cash tray. <br /> <br />1. Shelf shall be full width of window by 18" deep, centered under glazing and <br />covered with [black high-pressure laminate] [stainless steel 18 ga. #4 finish]. <br /> <br />G. Aluminum sections shall be manufactured in accordance with ASTM B209 and shall be <br />extruded aluminum alloy 6063 T5 [anodized] [powder coated] finish and be free of sharp <br />edges or burrs when in place. <br /> <br />H. Glazing Channel shall be a U-Channel specifically designed for securing glazing tightly in <br />place. <br /> <br />I. Angles and shall only be acceptable for top attachment. <br /> <br />J. Frame shall be [anodized aluminum] [18 ga. primed steel] [18 ga. stainless steel]. <br /> <br />K. The bottom of the glazing shall be capped with corresponding material on the frame. <br /> <br />PART 3 – EXECUTION <br /> <br />3.1 PREPARATION