Laserfiche WebLink
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 085653-5 <br /> <br /> <br />A. Prior to installing bullet resistive material, contractor shall verify that all supports have been <br />installed as required by the contract documents, architectural drawings, and approved <br />shop/CAD drawings. <br /> <br />B. Installer shall notify architect of any unsatisfactory preparation that is responsibility of <br />another installer. <br /> <br />C. Clean and prepare all surfaces per manufacturers recommendations for achieving the best <br />results for the substrate under the project conditions. <br /> <br />3.2 INSTALLATION <br /> <br />A. Do not begin installation until openings have been verified and surfaces properly prepared <br />in accordance with drawings. <br /> <br />B. Install in accordance with manufacturer’s instructions and UL 752. <br /> <br />C. Set all equipment plumb. <br /> <br />D. TSS Hole and Backer Transaction Window: shall arrive on site as a completed unit. Unit <br />shall be installed in provided opening (wall/door), secured to structure (anchors by others). <br /> <br />3.3 POST-INSTALLATION <br /> <br />A. TSS Hole and Backer Transaction Window shall be installed in accordance with <br />manufacturer’s printed recommendations, including adhering to anchoring and finishing <br />details. <br /> <br />B. Inspection and Cleaning: Verify installation is complete and complies with manufacturer’s <br />requirements. Clean product and accessories, removing excess sealant, labels and <br />protective covers. <br /> <br /> <br /> <br />END OF SECTION