My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum # 1 City of Sunny Isles Response-RFI Sheet
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Addendum # 1 City of Sunny Isles Response-RFI Sheet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:09:22 AM
Creation date
2/20/2025 9:06:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 085653-5 <br /> <br /> <br />A. Prior to installing bullet resistive material, contractor shall verify that all supports have been <br />installed as required by the contract documents, architectural drawings, and approved <br />shop/CAD drawings. <br /> <br />B. Installer shall notify architect of any unsatisfactory preparation that is responsibility of <br />another installer. <br /> <br />C. Clean and prepare all surfaces per manufacturers recommendations for achieving the best <br />results for the substrate under the project conditions. <br /> <br />3.2 INSTALLATION <br /> <br />A. Do not begin installation until openings have been verified and surfaces properly prepared <br />in accordance with drawings. <br /> <br />B. Install in accordance with manufacturer’s instructions and UL 752. <br /> <br />C. Set all equipment plumb. <br /> <br />D. TSS Hole and Backer Transaction Window: shall arrive on site as a completed unit. Unit <br />shall be installed in provided opening (wall/door), secured to structure (anchors by others). <br /> <br />3.3 POST-INSTALLATION <br /> <br />A. TSS Hole and Backer Transaction Window shall be installed in accordance with <br />manufacturer’s printed recommendations, including adhering to anchoring and finishing <br />details. <br /> <br />B. Inspection and Cleaning: Verify installation is complete and complies with manufacturer’s <br />requirements. Clean product and accessories, removing excess sealant, labels and <br />protective covers. <br /> <br /> <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.