My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum # 1 City of Sunny Isles Response-RFI Sheet
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Addendum # 1 City of Sunny Isles Response-RFI Sheet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:09:22 AM
Creation date
2/20/2025 9:06:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 095100-5 <br /> <br />3. Accurately level all main tee members. <br /> <br />4. Space cross tee members at 24 in. o.c. perpendicular to main tee members, forming <br />a 24 x 48 module or 24 x 24 module as required. <br />5. Provide separate hanger wire supports for all recessed fluorescent lighting fixtures. <br /> <br />6. Install edge moldings of type indicated at perimeter of acoustical ceiling area and <br />at locations where necessary to conceal edges of acoustical units. <br /> <br />a. Attach wall moldings to perimeter wall surfaces with attachment at <br />approximately 24 in. o.c. Miter all inside and outside corners. Butt joints <br />will not be permitted. <br /> <br />b. Apply continuous ribbon of acoustical sealant, concealed on back of vertical <br />leg before installing moldings. <br /> <br />c. Screw-attach moldings to substrate at intervals not over 16 in. o.c. and <br />not more than 3 in. from ends, leveling with ceiling suspension system to <br />tolerance of 1/8 in. in 12 ft. <br /> <br />7. Install acoustical lay-in boards within the exposed tee suspension system. <br /> <br />a. Install lay-in boards in moldings with hold-down clips. <br /> <br />3.3 CARE AND CLEANING <br /> <br />A. Upon completion, clean exposed surfaces of acoustical ceilings, including trim, edge <br />moldings and suspension members, in a manner and with materials recommended by <br />the manufacturer of the tile. Take care in handling, placing, and cleaning, as it is not <br />intended to field paint the tile. <br /> <br />B. Remove and replace work which cannot be successfully cleaned and repaired to <br />permanently eliminate evidence of damage. <br /> <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.