My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum # 1 City of Sunny Isles Response-RFI Sheet
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Addendum # 1 City of Sunny Isles Response-RFI Sheet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:09:22 AM
Creation date
2/20/2025 9:06:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 095113-1 <br />SECTION 09 51 13 <br />ACOUSTICAL PANEL CEILINGS <br />OPTIMA Lay-in and Tegular <br /> <br />PART 1 – GENERAL <br />1.1 RELATED DOCUMENTS <br />Drawings and general conditions of Contract, including General and Supplementary Conditions <br />and Divisions-1 Specification sections apply to work of this section. <br /> <br />1.2 SUMMARY <br />A. Section Includes <br />1. Acoustical ceiling panels <br />2. Exposed grid suspension system <br />3. Wire hangers, fasteners, main runners, cross tees, and wall angle moldings <br />4. Perimeter Trim <br /> <br />B. Related Sections <br />1. Section 09 23 00 – Gypsum Plastering <br />2. Section 09 29 00 – Gypsum Board <br />3. Section 09 51 00 – Acoustical Ceilings <br />4. Division 23 - HVAC Air Distribution <br />5. Division 26 - Electrical <br /> <br />C. ALTERNATES <br />1. Prior Approval: Unless otherwise provided for in the Contract documents, proposed <br />product substitutions may be submitted no later than TEN (10) working days prior to the <br />date established for receipt of bids. Acceptability of a proposed substitution is contingent <br />upon the Architect's review of the proposal for acceptability and approved products will <br />be set forth by the Addenda. If included in a Bid are substitute products that have not <br />been pre-approved by the architect and included in the Addenda, the originally specified <br />products shall be provided without additional compensation. <br />2. Submittals that do not provide adequate data for the product evaluation will not be <br />considered. The proposed substitution must meet all requirements of this section, <br />including but not necessarily limited to, the following: Single source materials supplier s; <br />Underwriters' Laboratories Classified Acoustical performance; Panel design, size,
The URL can be used to link to this page
Your browser does not support the video tag.