My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum # 1 City of Sunny Isles Response-RFI Sheet
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Addendum # 1 City of Sunny Isles Response-RFI Sheet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:09:22 AM
Creation date
2/20/2025 9:06:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 095126-1 <br />SECTION 09 51 26 <br />WoodWorks Linear Veneered Open <br /> <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />Drawings and general conditions of Contract, including General and Supplementary <br />Conditions and Divisions-1 Specification sections apply to work of this section. <br />1.2 SUMMARY <br />a) Section Includes: <br />1. WoodWorks Linear Veneered Open <br />2. Exposed grid suspension system. <br />3. Wire hangers, fasteners, main runners, cross tees, wall angle moldings and <br />accessories. <br />b) Related Sections: <br />1. Section 09 23 00 – Gypsum Plastering <br />2. Section 09 29 00 – Gypsum Board <br />3. Section 09 22 16 - Non-Structural Metal Framing <br />4. Divisions 15 - HVAC <br />5. Division 16 - Electrical Work <br />c) Alternates <br />1. Prior Approval: Unless otherwise provided for in the Contract documents, <br />submit proposed product substitutions no later than TEN (10) working days <br />prior to the date established for receipt of bids. Acceptability of a proposed <br />substitution is contingent upon the Architect’s review and acceptance. <br />Approved products will be set forth by the Addenda. If a substitution is <br />included in a Bid and is not approved by an Addendum, the specified <br />products shall be provided as in place of the substitute without additional <br />compensation. <br />2. Submittals, which do not provide adequate data for the product evaluation, <br />will not be considered. The proposed substitution must meet all requirements <br />of this section, including but not necessarily limited to, the following: Single <br />source materials suppliers (if specified in Section 1.5); panel design, size, <br />composition, color, and finish; suspension system component profiles and <br />sizes; compliance with the referenced standards. <br /> <br />1.3 REFERENCES <br />a) American Society for Testing and Materials (ASTM): <br />1. ASTM A 641 Standard Specification for Zinc-Coated (Galvanized) Carbon <br />Steel Wire.
The URL can be used to link to this page
Your browser does not support the video tag.