My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 023200 Geotechnical Investigations-1 <br /> <br />SECTION 023200 <br />GEOTECHNICAL INVESTIGATIONS <br /> <br />PART 1 - GENERAL <br /> <br />1.1 GENERAL PROVISIONS <br /> <br />A. Related Documents: Drawings and General Provisions of Contract, including General <br />and Supplementary Conditions apply to work of this Section. <br /> <br />1.2 DESCRIPTION OF WORK <br /> <br />A. Contractor shall review the geotechnical data report prepared for the project by S.W. <br />Cole Engineering, Inc. appended to this section of Project. During the Bidding Process, <br />the Contractor may conduct his own subsurface investigations after requesting and <br />receiving prior approval from the Owner. The request for approval shall be accompanied <br />by a plan indicating the location and type of investigations to be undertaken by the <br />Contractor. The Contractor is encouraged to verify Owner’s subsurface investigations <br />and shall notify the Owner in writing prior to the bid date of any discrepancies. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.1 REPORT <br /> <br />A. Subsurface conditions have been investigated by test pits, borings, and probes. <br />Locations of the test pits and borings are shown on the contract drawings. Logs of the <br />explorations are also appended to these specifications. <br /> <br />B. Said subsurface investigations are not warranted to show the actual subsurface <br />conditions except at the location of said test pits or investigations, and at these points <br />are subject to inaccuracies inherent in methods used and to variations in the <br />classification and interpretation of soil layers. <br /> <br />C. Subsurface information is included only as an aid to the Bidder and it is the obligation <br />of the Bidder to draw his own conclusions of subsurface conditions from his own <br />investigations prior to submitting his proposal. The Contractor agrees, in signing his <br />Contract, that he will make no claims against the Owner or Architect, if in carrying out <br />the work, he finds that the actual conditions encountered in performing the work do not <br />conform to conditions presented, discussed, or anticipated prior to the commencement <br />of work, the Contractor shall notify the Owner immediately of such differences in the <br />conditions. <br /> <br />PART 3 - EXECUTION <br /> <br />3.1 REPORT REVIEW <br /> <br />A. A copy of the geotechnical engineering services report is appended to the project <br />manual and shall be considered part of the Contract Documents. <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.