My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 028200 Asbestos Abatement-16 <br />ATTACHMENT A <br />ASBESTOS COMPLIANCE WORK PLAN OUTLINE <br /> <br /> <br />In accordance LBNL’s Asbestos Abatement Specifications, the Subcontractor is required to prepare a writ- <br />ten (typed or word-processed), site-specific Asbestos Work Plan, and submit to the University prior to <br />start of work. This plan is required for the Subcontractor to meet OSHA requirements as well as the Pro- <br />ject Specifications, and shall describe work procedures and control methods that will protect LBNL facili- <br />ties and staff. <br /> <br />The Subcontractor shall prepare the Asbestos Work Plan to include, at a minimum, the following infor- <br />mation: <br /> <br />I. Location of Work: <br /> <br /> The work to be completed under this Asbestos Work Plan will be completed at: <br /> Lawrence Berkeley National Laboratory <br /> One Cyclotron Road <br /> (Building name) <br /> (Location within building) <br /> <br /> Previous hazardous materials inspections or surveys have found that asbestos-containing <br />materials are present at the following locations: <br /> <br /> (list all materials and locations, to assure LBNL that the Subcontractor is aware of all <br />hazardous materials locations) <br /> <br /> The presence of asbestos represents a hazard to workers who may disturb these materials during <br />the course of this work. <br /> <br />II. Description of Work: <br /> <br /> Describe the anticipated work scope, including: <br /> <br /> A. Removal (list materials and locations) <br /> B. Encapsulation (list materials and locations) <br /> C. Repair (list materials and locations) <br /> D. Decontamination (list materials and locations) <br /> E. Any other activities that will or may result in worker exposures to asbestos. <br /> <br />III. Schedule: <br /> <br />A. General <br />Start Date: <br />Completion Date: <br /> <br />The competent person [ ], will conduct worksite visual inspections on a daily basis, <br />or more often as necessary. <br /> <br />B. Phase Dates <br />
The URL can be used to link to this page
Your browser does not support the video tag.