My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 028200 Asbestos Abatement-15 <br />2. Waste water containing asbestos, including drainage from decontamination <br />showers, shall be filtered in accordance with the following requirements prior to <br />introduction into the sanitary sewer system. <br /> <br />a. Filter water using four in-line filter cartridges with 2" inlets and outlets. <br />The outlet of each filter cartridge shall be connected in series to the inlet <br />of the next cartridge. The first cartridge shall contain 100 µm prefilters <br />and the second and third cartridge shall contain 25 µm filters and the <br />final cartridge shall contain 5 µm filters. <br />b. Spare filters of all three sizes shall be maintained at the site at all times <br />to replace prefilters during cleaning. <br />c. When the prefilters become clogged, replace with spares, store <br />accumulated debris as contaminated waste for disposal by LBNL, and <br />wash out the prefilters in the shower, allowing the drainage from the <br />cleaning operation to go through the filtration system. <br />d. Provide a holding tank for contaminated wastewater as required to <br />prevent backup of water into shower when the amount of water <br />generated exceeds the flow rate of the filters. <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.