Laserfiche WebLink
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br /> <br />Project No. 21-1011 November 2024 012500 SUBSTITUTION PROCEDURES-1 <br /> <br />SECTION 012500 <br />SUBSTITUTION PROCEDURES <br /> <br />PART 1 - GENERAL <br /> <br />1.1 DESCRIPTION <br /> <br />A. This Section specifies the procedures to be followed for preparing, submitting, amending <br />and updating of lists of products proposed to be incorporated in the work. <br /> <br />1.2 SELECTED PRODUCTS <br /> <br />A. Within 15 days after the effective date of Notice to Proceed, submit five copies of the list <br />of selected products. Arrange the list in the order of each Section's appearance in the <br />specification. <br /> <br />B. For products specified only by reference standards, any product satisfying those <br />standards may be selected. Show name and address of manufacturer; trade name, <br />model number or catalog designation of the product; manufacturer's reference standards <br />and pertinent performance and test data. <br /> <br />C. For products specified by naming one product or by naming several products, this <br />establishes a product standard. Any other product, which is equal in the opinion of the <br />Architect/Engineer of record, may be furnished. A request must be submitted to the <br />Engineer as required for substitutions, for acceptance of products not specifically named. <br />C. Amend and update list as changes concerning the information become known. <br /> <br />1.3 LIST OF SUBSTITUTE PRODUCTS AND METHODS <br /> <br />A. Formal requests from the Contractor will be considered by the Architect/Engineer of <br />Record for substitution of products and methods in place of those specified, but only if <br />these requests are submitted within 15 days after effective date of Notice to Proceed. No <br />substitutions request will be considered after 15 days. Acceptance of substitute products <br />and methods shall be only for the characteristics and use named in the acceptance, and <br />shall be interpreted neither as a modification to the Specification and Drawing <br />requirements nor to establish acceptance of products and methods for other portions of <br />the project. The Architect/Engineer of Record shall judge the quality and suitability of <br />the substitute product and method and his decision shall be final. Where use of a <br />substitute product and method involves redesign of other parts of the Work, the cost and <br />time required to affect that redesign will be considered in evaluating the suitability of the <br />substitute product and method. <br /> <br />B. Submit (5) copies of list of substitute products and methods, including the following <br />information: <br />