THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024012613 REQUESTS FOR INTERPRETATION- <br />INFORMATION-2 <br /> <br />e. List of schedule activities which may be impacted by the request and a brief <br />explanation as to why there would be a schedule impact and specific date <br />constraints. <br />f. Clear description of what response the Contractor is expecting. <br /> <br />D. RFI Processing Procedure. <br /> <br />1. Upon receipt of the RFI, the Representative shall promptly date stamp the <br />request. The Representative is required to keep a log of all RFIs including <br />receipt date and date returned to the Contractor. <br /> <br />2. The Architect/Engineer of Record shall review the request to determine if further <br />information is required from the Contractor, once the RFI is resubmitted by the <br />Contractor, the RFI shall be restamped. The Architect/Engineer of Record will <br />coordinate a response and transmit the answer to the RFI via the Representative <br />to the Contractor. D. Time allowed for processing RFIs. <br /> <br />3. Although every attempt will be made to expeditiously resolve all RFIs, MDC shall <br />have (10) working days to respond to an RFI, from the date the RFI is received <br />by the Representative, including all necessary information needed to formulate a <br />response. Failure by the Contractor to allow sufficient time for MDC to formulate <br />a response to an RFI, as specified in this section, shall not constitute grounds for <br />a delay claim from the Contractor. <br /> <br />3.2 ATTACHMENTS: <br /> <br />A. Attachment 20 dated March 01, 2005, Request for Information <br /> <br />B. Attachment 21 dated March 01, 2005, Request for Information response <br /> <br />PART 4 - MEASUREMENT AND PAYMENT <br /> <br />4.1 MEASUREMENT <br /> <br />A. Work under this Section will not be separately measured for payment. <br /> <br /> <br />END OF SECTION