My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 032100 Reinforcing Steel-2 <br /> <br />1.1 SUBMITTALS <br />A. Submit under provisions of section 013300. <br /> <br />B. Shop Placement Drawings: Prepare in conformance to IBC Chapter 1 9, ACI 318 <br /> Chapter 7, andACl315. <br /> <br />1. Prepare in sufficient detail to resolve reinforcement intersections. <br /> <br />2. Show sizes, spacing, locations, quantities, bending and cutting schedules, <br /> bending and placing diagrams, stirrup spacing, and supporting and spacing <br />devices. <br /> <br />3. Prepare placement details for specific reinforcing intersections <br /> and clearances conditions not shown on Structural Drawings. <br /> <br />C. Manufacturer's Certificate: Mill test report of physical and chemical analysis for <br />ASTM A615 and ASTM A706 reinforcing steel. Certify that products meet or exceed <br />structural and specification requirements. <br /> <br />D. Test Reports: ICC Evaluation Services Report for mechanical splices (couplers) <br />showing compliance to specified requirements. <br /> <br />2.1 QUALITY ASSURANCE <br /> <br />A. Supply reinforcing steel in predetermined sizes and bends to eliminate field <br />alterations. Do not make alterations to shop formed steel without prior acceptance <br />for each instance by Engineer. <br /> <br />3.1 REGULATORY REQUIREMENTS <br /> <br />A. Conform to requirements of all applicable Codes, ordinances, and other <br />regulatory requirements. <br /> <br />B. Special Inspections: Conform to requirements of IBC Chapter 17 - Structural <br />Tests and Special Inspections and Division 1. <br /> <br />C. Reinforcing Steel: Conform to provisions of IBC Chapter 19, ACI 318, ACI 301, <br />and CRSI Manual of Standard Practice. <br /> <br />4.1 DELIVERY, STORAGE, AND HANDLING <br /> <br />A. Deliver, store and handle under provisions of Division 1. <br /> <br />B. Deliver reinforcement to site bundled, tagged, and marked. Use metal tags <br />indicating bar size, length s, and other information corresponding to markings <br />shown on placement diagrams. <br />C. Store and protect concrete reinforcement materials at site from damage, dirt and <br />rust.
The URL can be used to link to this page
Your browser does not support the video tag.