Laserfiche WebLink
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 032100 Reinforcing Steel-6 <br /> <br />3.4 FIELD QUALITY CONTROL <br /> <br />A. Conform to independent inspections specified Section 014523. <br /> <br />B. Inspect for acceptability before beginning concrete work of Related Sections. <br /> <br />3.5 ADJUSTING <br />A. Defective Reinforcing: Remove and replace: <br /> <br />1. Bars with kinks or bends not shown on Drawings. <br /> <br />2. Bars damaged due to bending or straightening. <br /> <br />3. Bars heated for bending. <br /> <br />4. Reinforcing steel not placed in accordance with provisions of Contract <br />Documents. <br /> <br /> <br />END OF SECTION