My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 033000 Cast-in-Place Concrete-4 <br /> <br /> <br />2. Cement <br /> <br />a. Mill Test Report. <br />b. Producer Name and Location. <br /> <br />3. Water <br /> <br />a. Specify Potable Water Source. <br /> <br />D. Design Mixtures: For each concrete mixture. Submit alternate design mixtures <br />when characteristics of materials, use of additional admixtures, Project conditions, <br />weather, test results, or other circumstances warrant adjustments. Design Mixtures <br />shall be reviewed according to the provisions of ACI 301. <br /> <br />1. Indicate amounts of mixing water to be withheld for later addition at <br />Project site. <br /> <br />Concrete Mix Properties: <br /> <br />1. Mix Design <br /> <br />a. Cementitious Materials (Lbs./C.Y.) <br />b. Fine Aggregate (Lbs./C.Y.) <br />c. Coarse Aggregate (Lbs./C.Y.) <br />d. Water (Lbs./C.Y.) <br />e. Admixtures. <br /> <br />2. Slump. <br /> <br />3. Air Content. <br /> <br />F. Floor surface flatness and levelness measurements indicating compliance with specified <br />tolerances. <br /> <br />G. Minutes of pre-placement conference. <br /> <br />1.5 QUALITY ASSURANCE <br /> <br />A. Perform work in accordance with ACI 301 <br /> <br />1. Maintain one copy of document on site. <br /> <br />B. Installer Qualifications: A qualified installer who employs on Project personnel <br />qualified as ACl-certified Flatwork Technician and Finisher and a supervisor who is an <br />ACl-certified Concrete Flatwork Technician. <br /> <br />C. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed <br />concrete products and that complies with ASTM C 94 requirements for production <br />facilities and equipment. <br /> <br />1. Manufacturer certified according to NRMCA's "Certification of Ready
The URL can be used to link to this page
Your browser does not support the video tag.