My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 035300 Concrete Floor Topping-2 <br />B. Installer Qualifications: Minimum 2-year experience installing similar products. <br />C. Mock Up: In a location designated by the Architect, place a minimum 100 square feet <br />floor mock up using materials, procedures and personnel proposed to be used on the <br />project. During mock-up and initial period of installation, the manufacturer of the surface <br />hardener will provide, at no cost, the service of a trained employee to aid in securing <br />proper use of the product. <br />1.6 PRE-INSTALLATION MEETINGS <br />A. Convene minimum two weeks prior to starting work of this section. <br />B. Pre-installation Meeting: Convene a pre-installation meeting three weeks before the start <br />of application of the concrete topping material. Require attendance of parties directly <br />affecting the work of this Section, including Contractor, Architect, applicator, and <br />manufacturer representative. <br />1.7 DELIVERY, STORAGE, AND HANDLING <br />A. Deliver and store products in manufacturer's unopened packaging bearing the brand <br />name and manufacturer's identification until ready for installation. <br />B. Handling: Handle materials to avoid damage. <br />1.8 PROJECT CONDITIONS <br />A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits <br />recommended by manufacturer for optimum results. Do not install products under <br />environmental conditions outside manufacturer's recommended limits. <br />1.9 SEQUENCING <br />A. Ensure that products of this section are supplied to affected trades in time to prevent <br />interruption of construction progress. <br />PART 2 - PRODUCTS <br />2.1 MANUFACTURERS <br />A. Acceptable Manufacturer: L&M Construction Chemicals, which is located at: 1 LATICRETE <br />Park N.; Bethany, CT 06524-3423; Toll Free Tel: 800-362-3331; Tel: 402-453-6600; <br />Email: request info (info@lmcc.com); Web:www.laticrete.com/lmcc <br />B. Requests for substitutions will be considered in accordance with provisions of Section 01 <br />60 00 - Product Requirements. <br />2.2 MATERIALS <br />A. Heavy Duty Emery Aggregate Concrete Topping: Class 6 and 7 industrial floors. Ready- <br />mixed with Portland cement. <br /> <br />1. Product: EMERY TOP 400 by L&M Construction Chemicals. <br /> <br />2. Physical properties and minimum test performance: <br />
The URL can be used to link to this page
Your browser does not support the video tag.