My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 035300 Concrete Floor Topping-3 <br />a. 100 percent natural emery aggregates, minimum 58% aluminum oxide <br />and 24% ferric oxide. <br />b. ACI 544.2 R89, Impact resistance. At seven days, no cracking after 4500 <br />blows. <br /> <br />c. ASTM C 1202, Chloride Ion Penetrability Results: rating: "Very Low," less <br />than 1,000 coulombs passing. <br /> <br />d. ASTM C 666/666M, Freeze-Thaw Durability Factor not less than 90%. <br />B. Evaporation Retardant: E-CON, by L&M Construction Chemicals, Inc. <br />C. Curing Compound: DRESS & SEAL WB 30, by L&M Construction Chemicals, Inc. <br />D. Semi-Rigid Joint Filler: JOINT TITE 750, by L&M Construction Chemicals, Inc. <br />E. Bonding Agent: Epo Bond by L&M Construction Chemicals, Inc. <br />F. Concrete Curing Cover: Transguard 4000 by Reef industries, or Hydracure sheeting, by <br />PNA Construction Technologies, or equal. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Verify by examination that surfaces are acceptable to receive the concrete topping. Notify <br />the Architect immediately if surfaces are not acceptable to receive material. <br />3.2 PREPARATION <br />A. Clean surfaces thoroughly prior to installation. <br />B. Prepare surfaces using the methods recommended by the manufacturer for achieving the <br />best result for the substrate under the project conditions. <br />3.3 CONCRETE PLACEMENT <br />A. Follow ACI 302.1R-96 recommendations for placement for concrete toppings. <br />B. Placement Over Plastic Concrete: <br /> <br />1. Maximum slump of five inches. <br /> <br />2. Maximum air content of three percent (3 percent). <br /> <br />3. Do not use set accelerating admixtures, such as calcium chloride. <br />3.4 APPLICATION <br />A. Over Pre-Set Concrete: The top surface of the concrete shall be scarified and left sound <br />but irregular, exposing the topmost surface of the coarse aggregate with a minimum <br />amplitude of 1/4 inch (6 mm) between peaks and valleys. The bonding agent is prepared <br />by mixing one part by volume Everbond with one part by volume dry Portland cement. <br />The bonding slurry is scrubbed into the surface of the substrate that is saturated surface <br />damp (SSD) no more than 15 minutes before the placement of the concrete topping. Do
The URL can be used to link to this page
Your browser does not support the video tag.