Laserfiche WebLink
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br />Project No. 21-1011 November 2024 036200-3 <br />2. Euco-NS, Euclid Chemical Company 800-321-7628 www.euclidchemical.com <br /> <br />3. Sure-Grip Grout, Dayton Superior 888-977-9600 www.daytonsuperior.com <br /> <br />4. Five Star Grout, Five Star Products, Inc. 800-243-2206 www.firestarproducts.com <br /> <br />5. Supreme, Gifford-Hill/American Admixtures 972-262-3600 <br /> <br />6. Crystex, L&M Construction Chemicals, Inc. 800-362-3331 www.lmcc.com <br /> <br />7. Burke Non-Ferrous, Non-Shrink Grout, Meadow Burke 877-518-7665 <br />www.meadowburke.com <br /> <br />8. 588 Grout, W.R. Meadows, Inc. 817-834-1969 www.wrmeadows.com <br /> <br />9. GC86 Grout, W.R. Meadows, Inc. 817-834-1969 www.wrmeadows.com <br /> <br />PART 3 – EXECUTION <br /> <br />3.1 GENERAL <br /> <br />A. Placing: The Contractor shall perform all mixing and placement in accordance with <br />the manufacturer's recommendations. <br /> <br />B. Temperature: The temperature of the grouting surfaces and the grout shall be maintained <br />between 50 degrees F and 90 degrees F during grouting and for a minimum of 24 hours <br />thereafter. <br />C. Elimination of Voids: Grout placement shall proceed in a manner that will assure the filling of <br />all spaces and intimate contact of the grout with contact surfaces. Grout holes shall be used; <br />location to be approved by Architect/Engineer if not otherwise detailed. <br /> <br />3.2 SURFACE PREPARATION <br /> <br />A. Concrete Surfaces: The concrete on which the grout will bear shall have attained its design <br />strength before grouting. <br /> <br />1. Concrete shall be sound and all surfaces to be in contact with the grout shall be entirely <br />free of oil, grease, laitance, curing compounds, and other deleterious substances. <br /> <br />2. Surfaces shall be roughened by chipping, sandblasting or other mechanical means to <br />assure bond of the grout to the existing concrete. <br /> <br />B. Metal Surfaces: All metal surfaces which are to be in direct contact with the grout shall be <br />thoroughly cleaned to bare metal immediately before grouting. Cool down hot base plates with <br />cold water. Heat cold base plates with hot water. <br /> <br />C. Adjacent Surfaces: Treat adjacent surfaces and formwork with a bond breaking material to <br />prevent bonding of excess grout. <br /> <br />3.3 INSTALLATION <br /> <br />A. Formwork: Forms shall remain in full contact with the grout until it hardens. <br /> <br />1. Forms shall be watertight and capable of supporting the grout until it cures.